H2Prism
Hydrogen calculators & data
Prism Brief
← All projects
Project record

Lingen Green Hydrogen

Public information about this hydrogen project, including status, location, and technical detail.

Hover or focus the dot next to a value to see its confidence and source.

11 sourced values · 3 earlier records

Sourced valueEarlier record, source not yet verified

StatusConceptEarlier record
Original source not yet verified
Capacity100 MWEarlier record
Original source not yet verified

Project Identity and Location

Public NameLingen Green HydrogenConfidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
Site Namebp refinery, Lingen (Ems)Confidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
Administrative AreaDE-NI (Lower Saxony)Confidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
AliasLGH2 (Phase 1)Confidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
Show 2 moreHide 2
External IdentifierP200-0042Confidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
Official NameLingen Green HydrogenConfidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project

Project Purpose and Configuration

ComponentsComponent Id: CMP-1; Kind: electrolyzer; Tech: PEM; Tech Raw: proton exchange membrane (PEM) electrolyzer systemConfidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
Project GroupExists: falseConfidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project
Project Typehydrogen_production_facilityConfidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project

Project Lifecycle and Change

EventDate: 2024-12-18; Date Precision: day; Ev Type: EV-05; Event Id: V-01; Raw Date Text: 18.12.2024; Tags: Accessed At: 2026-08-17; As Of: 2024-12; Confidence: high; Evidence: E-01; Judged By: transcription; Source: BP Europa SE press releaseConfidence: Reported
Source: Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen Project

Earlier records

TechnologyWater electrolysisEarlier record
Original source not yet verified

Sources

SourceTypePublisherAs of
Accelera to Power 100 MW Electrolyzer System for bp’s Lingen Green Hydrogen ProjectOriginal sourceinvestor.cummins.com