- Capacity
- 70 MW
- Target operation
- 2031
- Technology
- Electrolysis
- Country
- France
- Development stage
- Feasibility
Target operation
- 2029
- 2030
- 2031
- 2032
- 2033
Target year as recorded for this project. The axis does not imply stage history.
Country scale
#40 by recorded MW among 123 projects with capacity recorded in this country.
All stages are included. Capacity does not describe current production.
Project details
- Production capacity
- 12.1 ktpa
- Product
- Methanol
Sources (3)
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Laudun-l'Ardoise
Original value: Capacity (MWel): 70; Technology: Other Electrolysis; Product: MeOH (Capacity (MWel))
Original value: 70 MW (50 kt MeOH) (Announced Size)
Original value: 15555.555555555557 (Capacity (Nm³ H₂/h))
Original value: 12.127733333333333 (Capacity (kt H2/y))
Original value: Capacity (MWel): 70
Original value: 2031 (Schedule question: Date online)
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: Feasibility study
Original value: Methanol (Product: Methanol)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: 12.127733333333333 kt H2/y (Product: Hydrogen)
Original value: Methanol (Product: Hydrogen)
Original value: Feasibility
Original value: 70 MW
Original value: 2031
Original value: Laudun-l'Ardoise (Site: Laudun-l'Ardoise)
Original value: Methanol (Product: Methanol)
Original value: Other Electrolysis
Published value: 12.13 kt H2/y
- International Energy Agency
International Energy Agency
Original value: 15555.555555555557 (Capacity (Nm³ H₂/h))
Original value: 12.127733333333333 (Capacity (kt H2/y))
Original value: Water electrolysis (Technology: Water electrolysis)
Sources (2)
- IEA Hydrogen Production Projects Database
International Energy Agency
Original value: Location
- International Energy Agency
International Energy Agency
Original value: Location
Projects in France
Major projects: operating and FID first, then by recorded capacity.