KeyState Natural Gas Synthesis & CCUS

· United States

Feasibility

Capacity
—
Target operation
2031
Technology
—
Country
United States
Development stage
Feasibility

Target operation

2031Target operation
  1. 2029
  2. 2030
  3. 2031
  4. 2032
  5. 2033

Target year as recorded for this project. The axis does not imply stage history.

Project details

Site
West Keating Township
Production pathway
Natural gas reforming
Product
Ammonia
Process description
ATR+CCUS
Announced size
0.5 Mt CO2/y
Sources (4)
  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: West Keating Township (Site: West Keating Township)

    Original value: Ammonia (Product: Hydrogen)

    Original value: Ammonia (Product: Ammonia)

    Original value: Feasibility

    Original value: 0.5 Mt CO2/y

    Original value: NG w CCUS

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Feasibility study

    Original value: Natural gas reforming (Pathway: Natural gas reforming)

    Original value: ATR+CCUS

    Original value: Capacity (t CO₂ capt/y): 500000

    Original value: Ammonia (Product: Ammonia)

    Original value: 2028 (Schedule question: Date online)

  • International Energy Agency

    International Energy Agency

    Original value: Natural gas reforming (Pathway: Natural gas reforming)

    Original value: ATR+CCUS

    Original value: Ammonia (Product: Ammonia)

  • Pennsylvania — KeyState Nitrogen - KeyState Energy

    KeyState Energy

    Original value: 2031

Projects in United States

Major projects: operating and FID first, then by recorded capacity.

All projects in this country