Hydrospider Gösgen (Phase 1)
Overview
StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
TechnologyWater electrolysisEuropean Clean Hydrogen Partnership · as of 2025
Capacity2 MWHydrospider AG
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Final Usefuel for fuel-cell electric lorriesHydrospider AG
Power Source Detailelectricity produced locally from 100 percent hydropowerHydrospider AG
Capacity & economics
Production Volume300 tonnes H2/year (up to)Hydrospider AG
Timeline
No recorded project events.
Sources & record history
Sources
- European Hydrogen Observatory projects Dec2025 Shared by 3 fields: Snapshot 2025-12-01 · Confidence: reported · Older value (2025)
- Hydrospider AG Milestone: Hydrospider distributes 1,000 tonnes of green hydrogen
- Hydrospider AG Hydrospider delivers the first swap container to St.Gallen
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Hydrospider Gösgen (Phase 1) | View exact valueHydrospider Gösgen (Phase 1) | European Hydrogen Observatory projects Dec2025 | — | — |
| Final Use | fuel for fuel-cell electric lorries | View exact valuefuel for fuel-cell electric lorries | Milestone: Hydrospider distributes 1,000 tonnes of green hydrogen; Hydrospider delivers the first swap container to St.Gallen | Older value | |
| Power Source Detail | electricity produced locally from 100 percent hydropower | View exact valueelectricity produced locally from 100 percent hydropower | Hydrospider delivers the first swap container to St.Gallen | Older value | |
| Technology | Water electrolysis | View exact valueWater electrolysis | European Hydrogen Observatory projects Dec2025 | — | — |
| Capacity | 2 MW | View exact value2 MW | Hydrospider delivers the first swap container to St.Gallen; Milestone: Hydrospider distributes 1,000 tonnes of green hydrogen | Older value | |
| Production Volume | 300 tonnes H2/year (up to) | View exact value{"unit":"tonnes H2/year","value":300,"qualifier":"up to"} | Milestone: Hydrospider distributes 1,000 tonnes of green hydrogen | Older value | |
| Progress Status | Concept | View exact valueannounced_or_planned | European Hydrogen Observatory projects Dec2025 | — | — |
Record history
0 current sourced values · 6 older values · Record updated