SinneWetterstof Oosterwolde
Overview
StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
Country · regionOosterwolde, Friesland
Technologyelectrolyser
Productgroene waterstof
Capacity1.4 MWEuropean Clean Hydrogen Partnership · as of 2025
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Power Sourcezonne-energie
Project Typepilotproject
Capacity & economics
Production Volume100,000 kg/year original hydrogen production target; not yet achieved as of 13 December 2024
Status & timeline
Actual Outputmet verschillende systeemtesten op beperkte schaal groene waterstof geproduceerd
Lifecycle Stageafgerond
EventIn 2022 opende Alliander in Oosterwolde de allereerste binnenlandse waterstoffabriek naast een zonnepark dat is ontwikkeld door GroenLeven.Alliander announced early termination of the SinneWetterstof Oosterwolde hydrogen pilot on 13 December 2024; tests were to finish in the following weeks and a transferee was sought.
Timeline
No recorded project events.
Sources & record history
Sources
- GroenLeven Groene waterstoffabriek SinneWetterstof Oosterwolde · Publication date unknown · accessed 2026-08-28
- Alliander Pilot waterstofproductie Oosterwolde beëindigd · 2024-12-13 Shared by 3 fields: Source dated 2024-12-13 · Current
- Topsector Energie / Alliander Openbare voortgangsrapportage SinneWetterstof-project · 2025-09-24 Shared by 5 fields: Source dated 2025-09-24 · Current
- European Clean Hydrogen Partnership European Hydrogen Observatory projects Dec2025 Shared by 2 fields: Snapshot 2025-12-01 · Confidence: reported · Older value (2025)
- Alliander Pilot waterstofproductie Oosterwolde beëindigd · 2024-12-13 Shared by 2 fields: Source dated 2024-12-13 · Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | SinneWetterstof Oosterwolde | View exact valueSinneWetterstof Oosterwolde | Groene waterstoffabriek SinneWetterstof Oosterwolde | Publication date unknown · accessed 2026-08-28 | Current |
| Administrative Area | Oosterwolde, Friesland | View exact valueOosterwolde, Friesland | Pilot waterstofproductie Oosterwolde beëindigd | — | — |
| Power Source | zonne-energie | View exact valuezonne-energie | Openbare voortgangsrapportage SinneWetterstof-project | — | — |
| Product | groene waterstof | View exact valuegroene waterstof | Openbare voortgangsrapportage SinneWetterstof-project | — | — |
| Project Type | pilotproject | View exact valuepilotproject | Openbare voortgangsrapportage SinneWetterstof-project | — | — |
| Technology | electrolyser | View exact valueelectrolyser | Pilot waterstofproductie Oosterwolde beëindigd | — | — |
| Capacity | 1.4 MW | View exact value1.4 MW | European Hydrogen Observatory projects Dec2025 | — | — |
| Production Volume | 100,000 kg/year original hydrogen production target; not yet achieved as of 13 December 2024 | View exact value100,000 kg/year original hydrogen production target; not yet achieved as of 13 December 2024 | Pilot waterstofproductie Oosterwolde beëindigd | — | — |
| Actual Output | met verschillende systeemtesten op beperkte schaal groene waterstof geproduceerd | View exact valuemet verschillende systeemtesten op beperkte schaal groene waterstof geproduceerd | Openbare voortgangsrapportage SinneWetterstof-project | — | — |
| Event | In 2022 opende Alliander in Oosterwolde de allereerste binnenlandse waterstoffabriek naast een zonnepark dat is ontwikkeld door GroenLeven. | View exact valueIn 2022 opende Alliander in Oosterwolde de allereerste binnenlandse waterstoffabriek naast een zonnepark dat is ontwikkeld door GroenLeven. | Pilot waterstofproductie Oosterwolde beëindigd | — | — |
| Event | Alliander announced early termination of the SinneWetterstof Oosterwolde hydrogen pilot on 13 December 2024; tests were to finish in the following weeks and a transferee was sought. | View exact valueAlliander announced early termination of the SinneWetterstof Oosterwolde hydrogen pilot on 13 December 2024; tests were to finish in the following weeks and a transferee was sought. | Pilot waterstofproductie Oosterwolde beëindigd | — | — |
| Lifecycle Stage | afgerond | View exact valueafgerond | Openbare voortgangsrapportage SinneWetterstof-project | — | — |
| Progress Status | Concept | View exact valueannounced_or_planned | European Hydrogen Observatory projects Dec2025 | — | — |
Record history
10 current sourced values · 2 older values · Record updated