H2Prism
Hydrogen calculators & data

Hydro Havrand - Hoyanger

Norway · NO-46 Vestland

Overview

StatusFID / ConstructionInternational Energy Agency · as of 2026
Country · regionNorwayNorsk Hydro ASA · NO-46 VestlandNorsk Hydro ASA
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity5 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

ComponentsElectrolyser (PEM)Norsk Hydro ASA
Project Typehydrogen production facilityNorsk Hydro ASA

Status & timeline

Date online (tracker field)2026 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameHydro Høyanger recycling facilityNorsk Hydro ASA
AliasHydro Havrand - Høyanger; Høyanger green hydrogen pilotNorsk Hydro ASA
Official NameHøyanger Hydrogen pilotNorsk Hydro ASA

Additional project information

Administrative AreaHoyangerInternational Energy Agency · as of 2026
CountryNorwayInternational Energy Agency · as of 2026
Capacity (kt H2/y)0.75 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)5 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)962 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

  1. Announcement : 2022-Q4Norsk Hydro ASA
  2. Equipment ordered : 2023-05-22Plug Power Inc.
  3. Construction start : 2024-Q4Norsk Hydro ASA
  4. Target start of operation : 2026-H1Norsk Hydro ASA

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameHydro Havrand - Hoyanger
View exact valueHydro Havrand - Hoyanger
Hydro secures NOK 83.3 million for testing green hydrogen technology at HøyangerCurrent
Site NameHydro Høyanger recycling facility
View exact valueHydro Høyanger recycling facility
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Administrative AreaNO-46 Vestland
View exact valueNO-46 Vestland
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
AliasHydro Havrand - Høyanger; Høyanger green hydrogen pilot
View exact value[{"kind":"source_label","name":"Hydro Havrand - Høyanger"},{"kind":"other_spelling","name":"Høyanger green hydrogen pilot"}]
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
CountryNorway
View exact valueNOR
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Official NameHøyanger Hydrogen pilot
View exact value[{"lang":"en","name":"Høyanger Hydrogen pilot","evidence":["E-01"]}]
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
ComponentsElectrolyser (PEM)
View exact value{"kind":"전해조","tech":"PEM","tech_raw":"5MW containerized PEM electrolyzers","component_id":"CMP-1"}
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); Norwegian Water Resources and Energy Directorate (NVE) (https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=19290&type=A); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
TechnologyPEM
View exact valuePEM
IEA Hydrogen Projects dataset——
Capacity5 MW
View exact value5 MW
IEA Hydrogen Projects dataset——
EventAnnouncement : 2022-Q4
View exact value{"date":"2022-Q4","tags":{"as_of":"2022-Q4","source":"Norsk Hydro ASA Q4 2022 results","evidence":["E-01"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-01","event_id":"V-01","raw_date_text":"I fjerde kvartal","date_precision":"quarter"}
Norsk Hydro ASA (https://www.hydro.com/no/global/media/news/2023/hydros-fourth-quarter-2022-results/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventEquipment ordered : 2023-05-22
View exact value{"date":"2023-05-22","tags":{"as_of":"2023-05-22","source":"Plug Power press release","evidence":["E-03"],"judged_by":"worker_review","confidence":"medium","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-08","event_id":"V-02","raw_date_text":"May 22, 2023","date_precision":"day"}
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2023/Plug-Lands-Three-Electrolyzer-Deals-for-European-Green-Hydrogen-Projects-in-Hard-to-Decarbonize-Industries/default.aspx); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventConstruction start : 2024-Q4
View exact value{"date":"2024-Q4","tags":{"as_of":"2024-Q4","source":"Norsk Hydro ASA fourth quarter 2024 results","evidence":["E-05"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-10","event_id":"V-03","raw_date_text":"In the fourth quarter","date_precision":"quarter"}
Norsk Hydro ASA (https://www.hydro.com/en/global/media/news/2025/hydros-fourth-quarter-2024-resultsbauxite--alumina-record-results-partnering-for-a-green-transition/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventTarget start of operation : 2026-H1
View exact value{"date":"2026-H1","tags":{"as_of":"2026-02-13","source":"Norsk Hydro ASA Integrated Annual Report 2025","evidence":["E-06"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-14","event_id":"V-04","raw_date_text":"the first half of 2026","date_precision":"half"}
Norsk Hydro ASA (https://www.hydro.com/globalassets/06-investors/reports-and-presentations/annual-report/ar-2025/integrated-annual-report-2025.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventDate online : 2026
View exact value{"date":"2026","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusFID / Construction
View exact valueFID/Construction
IEA Hydrogen Projects dataset——
Administrative AreaHoyanger
View exact valueHoyanger
IEA Hydrogen Projects dataset——
CountryNorway
View exact valueNorway
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)0.75 kt H2/y
View exact value0.7496538461538461 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Announced Size)5 MW
View exact value5 MW
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)962 Nm³ H₂/h
View exact value961.5384615384615 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 16 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.