H2Prism
Hydrogen calculators & data

H2GO Energy Park Oude-Tonge - 1st phase

Netherlands

Overview

StatusOperationalH2Prism earlier record
Country · regionNetherlandsInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity2.5 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026

Status & timeline

Date online (tracker field)2026 (meaning under review)International Energy Agency · as of 2026

Additional project information

Administrative AreaOude-TongeInternational Energy Agency · as of 2026
Progress StatusFID / ConstructionInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)556 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)2.5 MWInternational Energy Agency · as of 2026
Capacity (kt H2/y)0.433 kt H2/yInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

  • IEA Hydrogen Projects dataset Shared by 12 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
  • H2Prism earlier record (SRC-S3)

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameH2GO Energy Park Oude-Tonge - 1st phase
View exact valueH2GO Energy Park Oude-Tonge - 1st phase
IEA Hydrogen Projects dataset——
CountryNetherlands
View exact valueNetherlands
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity2.5 MW
View exact value2.5 MW
IEA Hydrogen Projects dataset——
EventDate online : 2026
View exact value{"date":"2026","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusOperational
View exact valueOperational
H2Prism earlier record (SRC-S3); H2Prism earlier record (SRC-S3)Older value
Administrative AreaOude-Tonge
View exact valueOude-Tonge
IEA Hydrogen Projects dataset——
Progress StatusFID / Construction
View exact valueFID/Construction
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)556 Nm³ H₂/h
View exact value555.5555555555555 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (Announced Size)2.5 MW
View exact value2.5MW
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)0.433 kt H2/y
View exact value0.4331333333333333 kt H2/y
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 7 older values · Record updated

Review checked 11 Oct 2026: The operating status and phase allocation of this historical H2GO record are not independently confirmed. Greenpoint reported a 1 MW Oude-Tonge installation running, with final works and certification still preceding commercial use. Its relationship to the historical 2.5 MW and 23.5 MW phase records, and whether 26 MW is a combined total, remain unverified. Source announcement, 18 Jun 2026. This review does not change the stored historical values.

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.