H2Prism
Hydrogen calculators & data

Gwangyang LNG terminal blue hydrogen

South Korea · South Jeolla Province

Overview

Statusplanned; hydrogen supply targeted to start in 2029
Country · regionSouth Korea · South Jeolla Province
TechnologyPlanned LNG-based hydrogen production and associated CCS business under feasibility investigation (announced 14 February 2024; specific reforming process and capture rate not stated)
Producthydrogen (H2)

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Carbon ReductionCCS (carbon capture and storage)
Componentsclean hydrogen production facilities, carbon dioxide capture, liquefaction terminal
Configuration DetailUnknown technologyInternational Energy Agency · as of 2026
FeedstockLNG
Final UsePlanned supply to demand locations including Gwangyang Steelworks, Hadong and Yeosu from 2029 (plan announced 14 February 2024; actual delivery or specific application not established)
Project Typeclean hydrogen production and supply project using LNG with CCS

Status & timeline

Lifecycle Stagejoint feasibility investigation planned / feasibility study

Location & names

Site NameGwangyang LNG Terminal

Additional project information

Administrative AreaGwangyang LNG terminalInternational Energy Agency · as of 2026
Progress StatusConceptInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
TechnologyNG w CCUSInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameGwangyang LNG terminal blue hydrogen
View exact valueGwangyang LNG terminal blue hydrogen
POSCO teams up with UAE ADNOC for blue hydrogen - Hydrogen CentralSource dated 2024-01-31Current
Site NameGwangyang LNG Terminal
View exact valueGwangyang LNG Terminal
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Administrative AreaSouth Jeolla Province
View exact valueSouth Jeolla Province
POSCO INTERNATIONAL Completed Construction of Gwangyang LNG Terminal 1Source dated 2024-07-09Current
CountrySouth Korea
View exact valueSouth Korea
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Carbon ReductionCCS (carbon capture and storage)
View exact valueCCS (carbon capture and storage)
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Componentsclean hydrogen production facilities, carbon dioxide capture, liquefaction terminal
View exact value["clean hydrogen production facilities","carbon dioxide capture","liquefaction terminal"]
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Configuration DetailUnknown technology
View exact valueUnknown technology
IEA Hydrogen Projects dataset——
FeedstockLNG
View exact valueLNG
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Final UsePlanned supply to demand locations including Gwangyang Steelworks, Hadong and Yeosu from 2029 (plan announced 14 February 2024; actual delivery or specific application not established)
View exact valuePlanned supply to demand locations including Gwangyang Steelworks, Hadong and Yeosu from 2029 (plan announced 14 February 2024; actual delivery or specific application not established)
POSCO INTERNATIONAL and ADNOC Join Hands for Clean Hydrogen Business——
Producthydrogen (H2)
View exact valuehydrogen (H2)
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Project Typeclean hydrogen production and supply project using LNG with CCS
View exact valueclean hydrogen production and supply project using LNG with CCS
포스코그룹, 광양LNG터미널 활용해 블루수소 생산 본격화Source dated 2024-01-31Current
TechnologyPlanned LNG-based hydrogen production and associated CCS business under feasibility investigation (announced 14 February 2024; specific reforming process and capture rate not stated)
View exact valuePlanned LNG-based hydrogen production and associated CCS business under feasibility investigation (announced 14 February 2024; specific reforming process and capture rate not stated)
POSCO INTERNATIONAL and ADNOC Join Hands for Clean Hydrogen Business——
Lifecycle Stagejoint feasibility investigation planned / feasibility study
View exact valuejoint feasibility investigation planned / feasibility study
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Progress Statusplanned; hydrogen supply targeted to start in 2029
View exact valueplanned; hydrogen supply targeted to start in 2029
POSCO INTERNATIONAL and ADNOC, the State-Run Oil Corporation of Abu Dhabi, UAE ‘Join Hands’ for Clean Hydrogen Business——
Administrative AreaGwangyang LNG terminal
View exact valueGwangyang LNG terminal
IEA Hydrogen Projects dataset——
Progress StatusConcept
View exact valueConcept
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyNG w CCUS
View exact valueNG w CCUS
IEA Hydrogen Projects dataset——

Record history

12 current sourced values · 1 older value · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.