Green H2
Overview
StatusDormantInternational Energy Agency · as of 2026
Country · regionPolandInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
CapacityPlanned 100 MW electrolyser integrated with an energy storage system (ORLEN announcement, 17 June 2025)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Final UsePlanned renewable hydrogen for refinery operations at the Gdańsk fuel production site
Location & names
Site NameGdańsk fuel production site
Additional project information
Administrative AreaGdańskInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,140 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)100 MWInternational Energy Agency · as of 2026
Capacity (MWel)100 MWelInternational Energy Agency · as of 2026
Capacity (kt H2/y)0.889 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- ORLEN ORLEN Group secures over PLN 1.7 billion in National Recovery Plan funding for its hydrogen projects · 2025-06-17 Shared by 3 fields: Source dated 2025-06-17 · Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Green H2 | View exact valueGreen H2 | IEA Hydrogen Projects dataset | — | — |
| Site Name | Gdańsk fuel production site | View exact valueGdańsk fuel production site | ORLEN Group secures over PLN 1.7 billion in National Recovery Plan funding for its hydrogen projects | — | — |
| Country | Poland | View exact valuePoland | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown PtX | View exact valueUnknown PtX | IEA Hydrogen Projects dataset | — | — |
| Final Use | Planned renewable hydrogen for refinery operations at the Gdańsk fuel production site | View exact valuePlanned renewable hydrogen for refinery operations at the Gdańsk fuel production site | ORLEN Group secures over PLN 1.7 billion in National Recovery Plan funding for its hydrogen projects | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | Other Electrolysis | View exact valueOther Electrolysis | IEA Hydrogen Projects dataset | — | — |
| Capacity | Planned 100 MW electrolyser integrated with an energy storage system (ORLEN announcement, 17 June 2025) | View exact valuePlanned 100 MW electrolyser integrated with an energy storage system (ORLEN announcement, 17 June 2025) | ORLEN Group secures over PLN 1.7 billion in National Recovery Plan funding for its hydrogen projects | — | — |
| Progress Status | Dormant | View exact valueDormant | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Gdańsk | View exact valueGdańsk | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 1,140 Nm³ H₂/h | View exact value1140 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 100 MW | View exact value100MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 100 MWel | View exact value100 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 0.889 kt H2/y | View exact value0.8887896 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
3 current sourced values · 5 older values · Record updated