Tauron CO2-SNG

0.08 MW · Electrolysis · Poland

Operational

Poland Map: Natural Earth
Capacity
0.08 MW
Target operation
—
Technology
Electrolysis
Country
Poland
Development stage
Operational

Country scale

#14 by recorded MW among 14 projects with capacity recorded in this country.

  1. NeptHyne, phase 2999 MW
  2. H2Silesia - Polenergia105 MW
  3. Tauron CO2-SNG0.08 MW

All stages are included. Capacity does not describe current production.

Project details

Site
Elektrownia Łaziska / Łaziska Power Plant
Production capacity
0.01 ktpa
Operating status
Commissioning
Function
Conversion
Scale
Research or pilot
Announced size
18 Nm3/h
Operation start
2019
Sources (15)
  • Pilot plant initial results for the methanation process using CO2 from amine scrubbing at the Łaziska power plant in Poland

    Fuel / Elsevier

    Original value: Power-to-Gas methanation using a methanation reactor

    Original value: hydrogen from water electrolysis (Feedstock: hydrogen from water electrolysis)

    Original value: 4.5 m3 N/h SNG target

  • A pilot plant will convert CO2 into natural gas

    EIT InnoEnergy

    Original value: potential injection to existing gas network or compression to CNG for vehicular transport

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: 0.08099999999999999 MW

    Original value: 0.014033519999999999 kt H2/y (Product: Hydrogen)

    Original value: Gas grid injection (End use: Gas grid injection · Product: Synthetic methane)

    Original value: Synthetic methane (Product: Synthetic methane)

    Original value: Operational

    Published value: 0.08100 MW

    Published value: 0.01403 kt H2/y

  • Institute of Energy and Fuel Processing Technology

    Institute of Energy and Fuel Processing Technology

    Original value: We launched a pilot installation for methanation (CO2-SNG) with a capacity of 20 m3/h

  • Energy Transition Department

    Institute of Energy and Fuel Processing Technology

    Original value: We launched a pilot installation for methanation (CO2-SNG) with a capacity of 20 m3/h

  • Pilot installation will convert CO2 into natural gas

    TAURON Polska Energia S.A.

    Original value: Elektrownia Łaziska / Łaziska Power Plant (Site: Elektrownia Łaziska / Łaziska Power Plant)

    Original value: synthetic natural gas (SNG) / methane

    Original value: Conversion (Function: Conversion)

    Original value: Research or pilot

  • TAURON Polska Energia S.A.

    TAURON Polska Energia S.A.

    Original value: Elektrownia Łaziska / Łaziska Power Plant (Site: Elektrownia Łaziska / Łaziska Power Plant)

    Original value: Conversion (Function: Conversion)

    Original value: Research or pilot

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: 0.08099999999999999 MWel

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: Methane (Product: Methane)

    Original value: 18 Nm3/h

    Original value: 2019

  • International Energy Agency

    International Energy Agency

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 18 Nm3/h

    Original value: 2019

  • A pilot plant will convert CO2 into natural gas

    TAURON

    Original value: objective of the pilot plant commissioned by TAURON in the Łaziska power plant

  • TAURON

    TAURON

    Original value: objective of the pilot plant commissioned by TAURON in the Łaziska power plant

  • Pilot plant initial results for the methanation process using CO2 from amine scrubbing at the Łaziska power plant in Poland

    Fuel (Elsevier)

    Original value: pilot plant commissioned; research campaigns conducted

    Original value: Commissioning

    Original value: completed pilot project (2015–2019)

    Original value: research campaigns carried out at the CO2-SNG pilot plant at the Łaziska Power Plant in Poland in 2018

  • Fuel (Elsevier)

    Fuel (Elsevier)

    Original value: pilot plant commissioned; research campaigns conducted

    Original value: Commissioning

    Original value: completed pilot project (2015–2019)

    Original value: research campaigns carried out at the CO2-SNG pilot plant at the Łaziska Power Plant in Poland in 2018

  • CO2-SNG

    CCU Projects Database

    Original value: Project Status: Completed

  • CCU Projects Database

    CCU Projects Database

    Original value: Project Status: Completed

Projects in Poland

Major projects: operating and FID first, then by recorded capacity.

All projects in this country