- Capacity
- 0.08 MW
- Target operation
- —
- Technology
- Electrolysis
- Country
- Poland
- Development stage
- Operational
Country scale
#14 by recorded MW among 14 projects with capacity recorded in this country.
All stages are included. Capacity does not describe current production.
Project details
- Site
- Elektrownia Łaziska / Łaziska Power Plant
- Production capacity
- 0.01 ktpa
- Operating status
- Commissioning
- Function
- Conversion
- Scale
- Research or pilot
- Announced size
- 18 Nm3/h
- Operation start
- 2019
Sources (15)
- Pilot plant initial results for the methanation process using CO2 from amine scrubbing at the Łaziska power plant in Poland
Fuel / Elsevier
Original value: Power-to-Gas methanation using a methanation reactor
Original value: hydrogen from water electrolysis (Feedstock: hydrogen from water electrolysis)
Original value: 4.5 m3 N/h SNG target
- A pilot plant will convert CO2 into natural gas
EIT InnoEnergy
Original value: potential injection to existing gas network or compression to CNG for vehicular transport
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: 0.08099999999999999 MW
Original value: 0.014033519999999999 kt H2/y (Product: Hydrogen)
Original value: Gas grid injection (End use: Gas grid injection · Product: Synthetic methane)
Original value: Synthetic methane (Product: Synthetic methane)
Original value: Operational
Published value: 0.08100 MW
Published value: 0.01403 kt H2/y
- Institute of Energy and Fuel Processing Technology
Institute of Energy and Fuel Processing Technology
Original value: We launched a pilot installation for methanation (CO2-SNG) with a capacity of 20 m3/h
- Energy Transition Department
Institute of Energy and Fuel Processing Technology
Original value: We launched a pilot installation for methanation (CO2-SNG) with a capacity of 20 m3/h
- Pilot installation will convert CO2 into natural gas
TAURON Polska Energia S.A.
Original value: Elektrownia Łaziska / Łaziska Power Plant (Site: Elektrownia Łaziska / Łaziska Power Plant)
Original value: synthetic natural gas (SNG) / methane
Original value: Conversion (Function: Conversion)
Original value: Research or pilot
- TAURON Polska Energia S.A.
TAURON Polska Energia S.A.
Original value: Elektrownia Łaziska / Łaziska Power Plant (Site: Elektrownia Łaziska / Łaziska Power Plant)
Original value: Conversion (Function: Conversion)
Original value: Research or pilot
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: 0.08099999999999999 MWel
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: Methane (Product: Methane)
Original value: 18 Nm3/h
Original value: 2019
- International Energy Agency
International Energy Agency
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: 18 Nm3/h
Original value: 2019
- A pilot plant will convert CO2 into natural gas
TAURON
Original value: objective of the pilot plant commissioned by TAURON in the Łaziska power plant
- TAURON
TAURON
Original value: objective of the pilot plant commissioned by TAURON in the Łaziska power plant
- Pilot plant initial results for the methanation process using CO2 from amine scrubbing at the Łaziska power plant in Poland
Fuel (Elsevier)
Original value: pilot plant commissioned; research campaigns conducted
Original value: Commissioning
Original value: completed pilot project (2015–2019)
Original value: research campaigns carried out at the CO2-SNG pilot plant at the Łaziska Power Plant in Poland in 2018
- Fuel (Elsevier)
Fuel (Elsevier)
Original value: pilot plant commissioned; research campaigns conducted
Original value: Commissioning
Original value: completed pilot project (2015–2019)
Original value: research campaigns carried out at the CO2-SNG pilot plant at the Łaziska Power Plant in Poland in 2018
- CO2-SNG
CCU Projects Database
Original value: Project Status: Completed
- CCU Projects Database
CCU Projects Database
Original value: Project Status: Completed
Sources (2)
- Pilot plant initial results for the methanation process using CO2 from amine scrubbing at the Łaziska power plant in Poland
Fuel (Elsevier)
Original value: Location
- Fuel (Elsevier)
Fuel (Elsevier)
Original value: Location
Projects in Poland
Major projects: operating and FID first, then by recorded capacity.