Green fertilizer project Porsgrunn-Heroya, phase 2 - HEGRA
Green fertilizer project Porsgrunn-Heroya, phase 2 - HEGRA is a hydrogen project in Norway; recorded capacity: 480 MW - 400kt NH3/y.
Overview
StatusCancelledInternational Energy Agency · as of 2026
Country · regionNorway
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductAmmonia
Capacity480 MW - 400kt NH3/y
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration Detail480 MW - 400kt NH3/yUnknown PtX
Capacity & economics
Production Volume480 MW - 400kt NH3/y
Location & names
External Identifier1278
Additional project information
CountryNorwayInternational Energy Agency · as of 2026
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
ProductAmmoniaInternational Energy Agency · as of 2026
Capacity (Announced Size)480 MW - 400kt NH3/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- yara.com Yara and Linde Engineering agree to build a 24 MW green hydrogen demonstration plant in Norway. Both companies aim to achieve a significant carbon dioxide reduction in the production of fertilizers in Norway Shared by 8 fields: Current
- International Energy Agency IEA Hydrogen Projects dataset Shared by 6 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
Record history
7 current sourced values · 2 older values · Record updated