StatusDover site selected; definitive site sale agreement finalized, closing expected mid-fourth quarter 2026; engineering, permitting and stakeholder engagement advancing (planned facility)
Country · regionUnited StatesU.S. Department of Energy, Office of Clean Energy Demonstrations · DelawareDelaware Public Media · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026electrolysisKBR · as of 2024
ProductH2International Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026Energy System Design (ESD) study to support development of a green hydrogen production facility; study to optimize facility size, selection, and operationAternium · as of 2025
Power Sourcerenewable energyKBR · as of 2024
Project GroupMACH2Aternium · as of 2025
Project Typeclean hydrogen production facilityKBR · as of 2024
Location & names
Site NameDoverDelaware Public Media · as of 2026
Additional project information
Administrative AreaDelawareInternational Energy Agency · as of 2026
CountryUnited StatesInternational Energy Agency · as of 2026
Progress StatusConceptInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- U.S. Department of Energy, Office of Clean Energy Demonstrations CX Determination_MACH2 H2 Hub Phase 1 · Publication date unknown · accessed 2026-08-28 Shared by 2 fields: Publication date unknown · accessed 2026-08-28
- Delaware Public Media Aternium plans to produce hydrogen in Dover but isn’t counting on federal help · 2026-08-07 Shared by 2 fields: Source dated 2026-08-07 · Older value (2026)
- International Energy Agency IEA Hydrogen Projects dataset Shared by 6 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Aternium Aternium Contracts with Siemens Energy · 2025-04-01 Shared by 2 fields: Source dated 2025-04-01 · Older value (2025)
- KBR KBR Awarded Engineering Services Contract by First State Hydrogen · 2024-04-09 Shared by 3 fields: Source dated 2024-04-09 · Older value (2024)
- Aternium Aternium selects Dover, Delaware for first US heavy water and high purity hydrogen production facility · 2026-08-04
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | First State Hydrogen | View exact valueFirst State Hydrogen | CX Determination_MACH2 H2 Hub Phase 1 | — | Current |
| Site Name | Dover | View exact valueDover | Aternium plans to produce hydrogen in Dover but isn’t counting on federal help | — | — |
| Administrative Area | Delaware | View exact valueDelaware | Aternium plans to produce hydrogen in Dover but isn’t counting on federal help | — | — |
| Country | United States | View exact valueUSA | CX Determination_MACH2 H2 Hub Phase 1 | — | Older value |
| Configuration Detail | Unknown PtX | View exact valueUnknown PtX | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Energy System Design (ESD) study to support development of a green hydrogen production facility; study to optimize facility size, selection, and operation | View exact valueEnergy System Design (ESD) study to support development of a green hydrogen production facility; study to optimize facility size, selection, and operation | Aternium Contracts with Siemens Energy | — | — |
| Power Source | renewable energy | View exact valuerenewable energy | KBR Awarded Engineering Services Contract by First State Hydrogen | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Project Group | MACH2 | View exact valueMACH2 | Aternium Contracts with Siemens Energy | — | — |
| Project Type | clean hydrogen production facility | View exact valueclean hydrogen production facility | KBR Awarded Engineering Services Contract by First State Hydrogen | — | — |
| Technology | Other Electrolysis | View exact valueOther Electrolysis | IEA Hydrogen Projects dataset | — | — |
| Technology | electrolysis | View exact valueelectrolysis | KBR Awarded Engineering Services Contract by First State Hydrogen | — | — |
| Progress Status | Dover site selected; definitive site sale agreement finalized, closing expected mid-fourth quarter 2026; engineering, permitting and stakeholder engagement advancing (planned facility) | View exact valueDover site selected; definitive site sale agreement finalized, closing expected mid-fourth quarter 2026; engineering, permitting and stakeholder engagement advancing (planned facility) | Aternium selects Dover, Delaware for first US heavy water and high purity hydrogen production facility | Source dated 2026-08-04 | Current |
| Administrative Area | Delaware | View exact valueDelaware | IEA Hydrogen Projects dataset | — | — |
| Country | United States | View exact valueUnited States | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Concept | View exact valueConcept | IEA Hydrogen Projects dataset | — | — |
Record history