Fairfuel Atmosfair – PtL in Werlte is a hydrogen project in Emsland, Lower Saxony, Germany using PEM electrolysis and Fischer–Tropsch synthesis.

Overview

Statusfirst five tonnes produced by 28 June 2024; limited quantities reported thereafter
Country · regionGermany · Emsland, Lower Saxony
TechnologyPEM electrolysis and Fischer–Tropsch synthesis
Productsynthetic crude oil / crude kerosene refined into Jet A1 kerosene
Capacity1.25 MWEuropean Clean Hydrogen Partnership · as of 2025

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

ComponentsDAC module; on-site biogas plant; PEM electrolyzer; Fischer–Tropsch synthesis unit; refinery
Feedstockwater; CO₂ from on-site biogas plant and direct air capture
Final Useaviation fuel: Jet A1 delivered to Hamburg Airport and blended into aviation fuel system
Power Sourcerenewable electricity from nearby wind and solar power plants
Project TypePower-to-Liquid (PtL) / power-to-kerosene plant

Status & timeline

Actual Output5 (unit not recorded)
Lifecycle Stageimplemented / operating in simplified mode; future site options under evaluation
EventPlant inaugurated/commissioned on 4 October 2021

Location & names

Site NameWerlte; Emsland; Germany

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameFairfuel Atmosfair – PtL in Werlte
View exact valueFairfuel Atmosfair – PtL in Werlte
PtL-Anlage—
Site NameWerlte; Emsland; Germany
View exact valueWerlte; Emsland; Germany
Werlte | solarbelt fairfuel gGmbH—
Administrative AreaEmsland, Lower Saxony
View exact valueEmsland, Lower Saxony
Air Travel and Climate: German Plant Produces First Quantities of Carbon-Neutral Synthetic Kerosene—
CountryGermany
View exact valueGermany
Werlte | solarbelt fairfuel gGmbH—
ComponentsDAC module; on-site biogas plant; PEM electrolyzer; Fischer–Tropsch synthesis unit; refinery
View exact valueDAC module; on-site biogas plant; PEM electrolyzer; Fischer–Tropsch synthesis unit; refinery
Werlte | solarbelt fairfuel gGmbH—
Feedstockwater; CO₂ from on-site biogas plant and direct air capture
View exact valuewater; CO₂ from on-site biogas plant and direct air capture
PtL-Anlage—
Final Useaviation fuel: Jet A1 delivered to Hamburg Airport and blended into aviation fuel system
View exact valueaviation fuel: Jet A1 delivered to Hamburg Airport and blended into aviation fuel system
Werlte | solarbelt fairfuel gGmbH—
Power Sourcerenewable electricity from nearby wind and solar power plants
View exact valuerenewable electricity from nearby wind and solar power plants
Werlte | solarbelt fairfuel gGmbH—
Productsynthetic crude oil / crude kerosene refined into Jet A1 kerosene
View exact valuesynthetic crude oil / crude kerosene refined into Jet A1 kerosene
PtL-Anlage—
Project TypePower-to-Liquid (PtL) / power-to-kerosene plant
View exact valuePower-to-Liquid (PtL) / power-to-kerosene plant
Werlte | solarbelt fairfuel gGmbH—
TechnologyPEM electrolysis and Fischer–Tropsch synthesis
View exact valuePEM electrolysis and Fischer–Tropsch synthesis
PtL-Anlage—
Capacity1.25 MW
View exact value1.25 MW
European Hydrogen Observatory projects Dec2025 Confidence: reportedSnapshot 2025-12-01Older value (2025)
Actual Output5 (unit not recorded)
View exact value5
Air Travel and Climate: German Plant Produces First Quantities of Carbon-Neutral Synthetic Kerosene—
EventPlant inaugurated/commissioned on 4 October 2021
View exact valuePlant inaugurated/commissioned on 4 October 2021
Power-to-Kerosene: Green hydrogen for climate-neutral aviationCurrent
Lifecycle Stageimplemented / operating in simplified mode; future site options under evaluation
View exact valueimplemented / operating in simplified mode; future site options under evaluation
Air Travel and Climate: German Plant Produces First Quantities of Carbon-Neutral Synthetic Kerosene—
Progress Statusfirst five tonnes produced by 28 June 2024; limited quantities reported thereafter
View exact valuefirst five tonnes produced by 28 June 2024; limited quantities reported thereafter
Werlte | solarbelt fairfuel gGmbH—

Record history

14 current sourced values · 1 older value · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.