Statuscooperation agreement signed; installation, testing and operation announced for the hydrogen center
Country · regionGermany · Uckermark region
Technologypressurized alkaline electrolysis (S+ generation), solid oxide electrolysis cell (SOEC) / high-temperature electrolysis
ProductH2International Energy Agency · as of 2026
Capacity15 MW (up to; total capacity of several electrolyzer systems); 10 MW (Sunfire S+ pressurized alkaline electrolyzer within the cooperation)

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Carbon Reductiongreen hydrogen from renewable electricity; intended to reduce power-grid load and use surplus electricity
Componentsmultiple electrolyzer systems and a hydrogen filling station
Configuration Detailup to 15 MW total electrolyzer systems, including a 10 MW pressurized alkaline S+ electrolyzer and further SOEC systems
Final Usemobility sector, particularly local public transport; trailer supply to customers is described as possible
Power Sourcerenewable electricity
Power Source Detailown power line to the renewable Uckermark power plant; regional renewable electricity
Project Typeelectrolysis test field / hydrogen center

Status & timeline

Lifecycle Stageannounced/planned test-field realization as of 2021-09-09
Operating Leveltest and operation planned for multiple electrolyzer systems; no actual operating level established
Eventcooperation agreement for electrolysis test field signed on 2021-09-09

Location & names

Site NamePrenzlau
AliasPrenzlau hydrogen center / electrolysis test field in Prenzlau

Additional project information

Progress StatusCancelledInternational Energy Agency · as of 2026
TechnologyALKInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameENERTRAG hydrogen center / electrolysis test field in Prenzlau
View exact valueENERTRAG hydrogen center / electrolysis test field in Prenzlau
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Site NamePrenzlau
View exact valuePrenzlau
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Administrative AreaUckermark region
View exact valueUckermark region
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
AliasPrenzlau hydrogen center / electrolysis test field in Prenzlau
View exact valuePrenzlau hydrogen center / electrolysis test field in Prenzlau
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
CountryGermany
View exact valueGermany
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Carbon Reductiongreen hydrogen from renewable electricity; intended to reduce power-grid load and use surplus electricity
View exact valuegreen hydrogen from renewable electricity; intended to reduce power-grid load and use surplus electricity
Neues Wasserstoffzentrum: ENERTRAG und Sunfire starten Kooperation zum Betrieb eines 10 MW Druck-Alkali-Elektrolyseurs—
Componentsmultiple electrolyzer systems and a hydrogen filling station
View exact valuemultiple electrolyzer systems and a hydrogen filling station
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Configuration Detailup to 15 MW total electrolyzer systems, including a 10 MW pressurized alkaline S+ electrolyzer and further SOEC systems
View exact valueup to 15 MW total electrolyzer systems, including a 10 MW pressurized alkaline S+ electrolyzer and further SOEC systems
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Final Usemobility sector, particularly local public transport; trailer supply to customers is described as possible
View exact valuemobility sector, particularly local public transport; trailer supply to customers is described as possible
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Power Sourcerenewable electricity
View exact valuerenewable electricity
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Power Source Detailown power line to the renewable Uckermark power plant; regional renewable electricity
View exact valueown power line to the renewable Uckermark power plant; regional renewable electricity
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
Project Typeelectrolysis test field / hydrogen center
View exact valueelectrolysis test field / hydrogen center
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Technologypressurized alkaline electrolysis (S+ generation), solid oxide electrolysis cell (SOEC) / high-temperature electrolysis
View exact value["pressurized alkaline electrolysis (S+ generation)","solid oxide electrolysis cell (SOEC) / high-temperature electrolysis"]
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Capacity15 MW (up to; total capacity of several electrolyzer systems); 10 MW (Sunfire S+ pressurized alkaline electrolyzer within the cooperation)
View exact value[{"unit":"MW","value":15,"qualifier":"up to; total capacity of several electrolyzer systems"},{"unit":"MW","value":10,"qualifier":"Sunfire S+ pressurized alkaline electrolyzer within the cooperation"}]
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Eventcooperation agreement for electrolysis test field signed on 2021-09-09
View exact valuecooperation agreement for electrolysis test field signed on 2021-09-09
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Lifecycle Stageannounced/planned test-field realization as of 2021-09-09
View exact valueannounced/planned test-field realization as of 2021-09-09
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Operating Leveltest and operation planned for multiple electrolyzer systems; no actual operating level established
View exact valuetest and operation planned for multiple electrolyzer systems; no actual operating level established
New Hydrogen Center: ENERTRAG And Sunfire Start Cooperation to Operate a 10 MW Pressurized Alkaline Electrolyzer—
Progress Statuscooperation agreement signed; installation, testing and operation announced for the hydrogen center
View exact valuecooperation agreement signed; installation, testing and operation announced for the hydrogen center
Neues Wasserstoffzentrum: ENERTRAG und Sunfire starten Kooperation zum Betrieb eines 10 MW Druck-Alkali-Elektrolyseurs—
Progress StatusCancelled
View exact valueCancelled
IEA Hydrogen Projects dataset——
TechnologyALK
View exact valueALK
IEA Hydrogen Projects dataset——

Record history

17 current sourced values · 1 older value · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.