Enertrag Magdeburg Osterweddingen (Phase 1)
Enertrag Magdeburg Osterweddingen (Phase 1) is a hydrogen project using 10 MW PEM electrolyser; recorded capacity: 10 MW.
Overview
StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
Technology10 MW PEM electrolyser
Capacity10 MW
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Final Usedecarbonisation of industry/heavy industry, fuel for long-haul transport, feed into hydrogen pipelines, long-term electricity generation during a dark lull
Power Sourcerenewable electricity from ENERTRAG own wind fields; nearby wind and solar fields
Project Typehydrogen plant / green hydrogen production plant
Capacity & economics
Production Volumearound 900 tonnes of green hydrogen per year
Status & timeline
Lifecycle Stageunder construction / construction started
Eventground-breaking / construction start on 2024-05-13
Location & names
Site NameOsterweddingen
Timeline
No recorded project events.
Sources & record history
Sources
- ENERTRAG SE Osterweddingen hydrogen plant Shared by 5 fields: Current
- KEYOU GmbH KEYOU und ENERTRAG verkünden Kooperation bei Spatenstich für Elektrolyseur im Industriepark Osterweddingen
- ENERTRAG SE Spatenstich für Elektrolyseur im Industriepark Osterweddingen Shared by 4 fields: Current
- European Clean Hydrogen Partnership European Hydrogen Observatory projects Dec2025
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Enertrag Magdeburg Osterweddingen (Phase 1) | View exact valueEnertrag Magdeburg Osterweddingen (Phase 1) | Osterweddingen hydrogen plant | — | |
| Site Name | Osterweddingen | View exact valueOsterweddingen | Osterweddingen hydrogen plant | — | |
| Final Use | decarbonisation of industry/heavy industry, fuel for long-haul transport, feed into hydrogen pipelines, long-term electricity generation during a dark lull | View exact value["decarbonisation of industry/heavy industry","fuel for long-haul transport","feed into hydrogen pipelines","long-term electricity generation during a dark lull"] | KEYOU und ENERTRAG verkünden Kooperation bei Spatenstich für Elektrolyseur im Industriepark Osterweddingen | Current | |
| Power Source | renewable electricity from ENERTRAG own wind fields; nearby wind and solar fields | View exact valuerenewable electricity from ENERTRAG own wind fields; nearby wind and solar fields | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Project Type | hydrogen plant / green hydrogen production plant | View exact valuehydrogen plant / green hydrogen production plant | Osterweddingen hydrogen plant | — | |
| Technology | 10 MW PEM electrolyser | View exact value10 MW PEM electrolyser | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Capacity | 10 MW | View exact value10 MW | Osterweddingen hydrogen plant | — | |
| Production Volume | around 900 tonnes of green hydrogen per year | View exact valuearound 900 tonnes of green hydrogen per year | Osterweddingen hydrogen plant | — | |
| Event | ground-breaking / construction start on 2024-05-13 | View exact valueground-breaking / construction start on 2024-05-13 | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Lifecycle Stage | under construction / construction started | View exact valueunder construction / construction started | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Progress Status | Concept | View exact valueannounced_or_planned | European Hydrogen Observatory projects Dec2025 Confidence: reported | Snapshot 2025-12-01 | Older value (2025) |
Record history
9 current sourced values · 1 older value · Record updated