Energiepark Pirmasens-Winzeln

Germany · Pirmasens

Overview

StatusOperating / fed into gas network for the biological methanation output; planned future expansion around an electrolyzer remains uncommissioned in the inspected source.
Country · regionGermany · Pirmasens
Technologybiotechnological methanation using hydrogen and carbon dioxide with archaea, water electrolysis using excess electrical power (planned facility)
Productmethane / biomethane, biogas/synthesis gas for feed-in to Stadtwerke Pirmasens gas grid
Capacity1.8 MW electrical rating for the planned water electrolysis unit; this is a component/facility rating and is not asserted as whole-project capacity.

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

ComponentsNawaro biogas plant, biogas upgrading plant for biotechnological methanation, biogas feed-in into the gas grid, planned water electrolysis unit connected to sewage works, planned straw digestion plant with fermentation centre
Feedstockbiogas carbon dioxide, hydrogen
Final UseFeed-in of produced methane/biomethane into the gas network of Stadtwerke Pirmasens; the source describes gas-network storage and later transformation to energy or heat as the P2G aim.
Project GroupThe Energy Park is a joint project of PFI, the City of Pirmasens, and the Municipal Utility Company of Pirmasens.

Capacity & economics

Production VolumeUp to 440,000 m3 of gas annually is stated for the plant configuration.

Status & timeline

Lifecycle StageOperating methane feed-in and existing pilot/research facilities are documented; water electrolysis and straw digestion are described as planned/future construction, not as commissioned.
Operating LevelThe biogas upgrading/methanation installation is described as a pilot plant and methane feed-in is stated since September 2016.
EventNawaro biogas plant: 2013/14; biogas upgrading plant for biotechnological methanation: 2015/16; biogas feed-in into gas grid: 2016/17.

Location & names

Site NamePirmasens-Winzeln Energy Park

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameEnergiepark Pirmasens-Winzeln
View exact valueEnergiepark Pirmasens-Winzeln
Biorefinery at Pirmasens-Winzeln Energy Park—
Site NamePirmasens-Winzeln Energy Park
View exact valuePirmasens-Winzeln Energy Park
Biorefinery at Pirmasens-Winzeln Energy Park—
Administrative AreaPirmasens
View exact valuePirmasens
Biorefinery at Pirmasens-Winzeln Energy Park—
CountryGermany
View exact valueGermany
Biorefinery at Pirmasens-Winzeln Energy Park—
ComponentsNawaro biogas plant, biogas upgrading plant for biotechnological methanation, biogas feed-in into the gas grid, planned water electrolysis unit connected to sewage works, planned straw digestion plant with fermentation centre
View exact value["Nawaro biogas plant","biogas upgrading plant for biotechnological methanation","biogas feed-in into the gas grid","planned water electrolysis unit connected to sewage works","planned straw digestion plant with fermentation centre"]
Biorefinery at Pirmasens-Winzeln Energy Park—
Feedstockbiogas carbon dioxide, hydrogen
View exact value["biogas carbon dioxide","hydrogen"]
Biorefinery at Pirmasens-Winzeln Energy Park—
Final UseFeed-in of produced methane/biomethane into the gas network of Stadtwerke Pirmasens; the source describes gas-network storage and later transformation to energy or heat as the P2G aim.
View exact valueFeed-in of produced methane/biomethane into the gas network of Stadtwerke Pirmasens; the source describes gas-network storage and later transformation to energy or heat as the P2G aim.
P2G - Power to Gas—
Productmethane / biomethane, biogas/synthesis gas for feed-in to Stadtwerke Pirmasens gas grid
View exact value["methane / biomethane","biogas/synthesis gas for feed-in to Stadtwerke Pirmasens gas grid"]
P2G - Power to Gas—
Project GroupThe Energy Park is a joint project of PFI, the City of Pirmasens, and the Municipal Utility Company of Pirmasens.
View exact valueThe Energy Park is a joint project of PFI, the City of Pirmasens, and the Municipal Utility Company of Pirmasens.
Biorefinery at Pirmasens-Winzeln Energy Park—
Technologybiotechnological methanation using hydrogen and carbon dioxide with archaea, water electrolysis using excess electrical power (planned facility)
View exact value["biotechnological methanation using hydrogen and carbon dioxide with archaea","water electrolysis using excess electrical power (planned facility)"]
Biorefinery at Pirmasens-Winzeln Energy Park—
Capacity1.8 MW electrical rating for the planned water electrolysis unit; this is a component/facility rating and is not asserted as whole-project capacity.
View exact value1.8 MW electrical rating for the planned water electrolysis unit; this is a component/facility rating and is not asserted as whole-project capacity.
Biorefinery at Pirmasens-Winzeln Energy Park—
Production VolumeUp to 440,000 m3 of gas annually is stated for the plant configuration.
View exact valueUp to 440,000 m3 of gas annually is stated for the plant configuration.
P2G - Power to Gas—
EventNawaro biogas plant: 2013/14; biogas upgrading plant for biotechnological methanation: 2015/16; biogas feed-in into gas grid: 2016/17.
View exact valueNawaro biogas plant: 2013/14; biogas upgrading plant for biotechnological methanation: 2015/16; biogas feed-in into gas grid: 2016/17.
Biorefinery at Pirmasens-Winzeln Energy Park—
Lifecycle StageOperating methane feed-in and existing pilot/research facilities are documented; water electrolysis and straw digestion are described as planned/future construction, not as commissioned.
View exact valueOperating methane feed-in and existing pilot/research facilities are documented; water electrolysis and straw digestion are described as planned/future construction, not as commissioned.
Biorefinery at Pirmasens-Winzeln Energy Park—
Operating LevelThe biogas upgrading/methanation installation is described as a pilot plant and methane feed-in is stated since September 2016.
View exact valueThe biogas upgrading/methanation installation is described as a pilot plant and methane feed-in is stated since September 2016.
P2G - Power to Gas—
Progress StatusOperating / fed into gas network for the biological methanation output; planned future expansion around an electrolyzer remains uncommissioned in the inspected source.
View exact valueOperating / fed into gas network for the biological methanation output; planned future expansion around an electrolyzer remains uncommissioned in the inspected source.
P2G - Power to Gas—

Record history

15 current sourced values · 0 older values · Record updated