ECB Omega Green biofuel project
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionParaguayInternational Energy Agency · as of 2026
TechnologyALKInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity310 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Status & timeline
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaRandom location in ParaguayInternational Energy Agency · as of 2026
Capacity (Announced Size)310 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)67,391 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)52.5 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- Blog Biocombustível Avançado - Erasmo Carlos Battistella BSBIOS signs Free Trade Zone contract for the Omega Green biorefinery with the government of Paraguay – Blog Biocombustível Avançado – Erasmo Carlos Battistella
- International Energy Agency IEA Hydrogen Projects dataset Shared by 10 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | ECB Omega Green biofuel project | View exact valueECB Omega Green biofuel project | BSBIOS signs Free Trade Zone contract for the Omega Green biorefinery with the government of Paraguay – Blog Biocombustível Avançado – Erasmo Carlos Battistella | Current | |
| Country | Paraguay | View exact valueParaguay | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | ALK | View exact valueALK | IEA Hydrogen Projects dataset | — | — |
| Capacity | 310 MW | View exact value310 MW | IEA Hydrogen Projects dataset | — | — |
| Event | Date online : 2027 | View exact value{"date":"2027","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Random location in Paraguay | View exact valueRandom location in Paraguay | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 310 MW | View exact value310MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 67,391 Nm³ H₂/h | View exact value67391.3043478261 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 52.5 kt H2/y | View exact value52.54095652173913 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
0 current sourced values · 6 older values · Record updated