Douglas County PUD - industrial area north of East Wenatchee
Overview
StatusClose to commissioning (reported 9 October 2025)
Country · regionUnited StatesInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity5 MW PEM electrolyser (reported 9 October 2025)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Capacity & economics
Production VolumeStated full-capacity capability: 2 metric tons of hydrogen/day (reported 9 October 2025)
Status & timeline
Lifecycle StageUnder construction since March 2021 (reported 9 October 2025)
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaBaker FlatsInternational Energy Agency · as of 2026
Progress StatusFID / ConstructionInternational Energy Agency · as of 2026
Capacity (kt H2/y)0.75 kt H2/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)962 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (MWel)5 MWelInternational Energy Agency · as of 2026
Capacity (Announced Size)5 MWInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Douglas County PUD Douglas PUD Commission Cuts Ribbon at Renewable Hydrogen Production Facility on National Hydrogen Day · 2025-10-09 Shared by 4 fields: Source dated 2025-10-09 · Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Douglas County PUD - industrial area north of East Wenatchee | View exact valueDouglas County PUD - industrial area north of East Wenatchee | IEA Hydrogen Projects dataset | — | — |
| Country | United States | View exact valueUnited States | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | PEM | View exact valuePEM | IEA Hydrogen Projects dataset | — | — |
| Capacity | 5 MW PEM electrolyser (reported 9 October 2025) | View exact value5 MW PEM electrolyser (reported 9 October 2025) | Douglas PUD Commission Cuts Ribbon at Renewable Hydrogen Production Facility on National Hydrogen Day | — | — |
| Production Volume | Stated full-capacity capability: 2 metric tons of hydrogen/day (reported 9 October 2025) | View exact valueStated full-capacity capability: 2 metric tons of hydrogen/day (reported 9 October 2025) | Douglas PUD Commission Cuts Ribbon at Renewable Hydrogen Production Facility on National Hydrogen Day | — | — |
| Event | Date online : 2027 | View exact value{"date":"2027","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Lifecycle Stage | Under construction since March 2021 (reported 9 October 2025) | View exact valueUnder construction since March 2021 (reported 9 October 2025) | Douglas PUD Commission Cuts Ribbon at Renewable Hydrogen Production Facility on National Hydrogen Day | — | — |
| Progress Status | Close to commissioning (reported 9 October 2025) | View exact valueClose to commissioning (reported 9 October 2025) | Douglas PUD Commission Cuts Ribbon at Renewable Hydrogen Production Facility on National Hydrogen Day | — | — |
| Administrative Area | Baker Flats | View exact valueBaker Flats | IEA Hydrogen Projects dataset | — | — |
| Progress Status | FID / Construction | View exact valueFID/Construction | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 0.75 kt H2/y | View exact value0.7496538461538461 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 962 Nm³ H₂/h | View exact value961.5384615384615 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 5 MWel | View exact value5 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 5 MW | View exact value5MW | IEA Hydrogen Projects dataset | — | — |
Record history
4 current sourced values · 4 older values · Record updated