Cerilon gas-to-liquids complex (ND)
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionUnited StatesInternational Energy Agency · as of 2026
TechnologyNG w CCUSInternational Energy Agency · as of 2026
ProductSynfuelsInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Configuration DetailUnknown technologyInternational Energy Agency · as of 2026
Additional project information
Administrative AreaWilliams countyInternational Energy Agency · as of 2026
Capacity (Announced Size)2 Mt CO2 (24,000 barrels per day (bpd) of liquid hydrocarbon products from gas)International Energy Agency · as of 2026
Capacity (t CO₂ capt/y)2,000,000 t CO₂ capt/yInternational Energy Agency · as of 2026
Capacity (kt H2/y)13.4 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- BIC Magazine $2.8B Cerilon GTL facility to be be built in North Dakota - BIC Magazine
- International Energy Agency IEA Hydrogen Projects dataset Shared by 9 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Cerilon gas-to-liquids complex (ND) | View exact valueCerilon gas-to-liquids complex (ND) | $2.8B Cerilon GTL facility to be be built in North Dakota - BIC Magazine | Current | |
| Country | United States | View exact valueUnited States | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown technology | View exact valueUnknown technology | IEA Hydrogen Projects dataset | — | — |
| Product | Synfuels | View exact valueSynfuels | IEA Hydrogen Projects dataset | — | — |
| Technology | NG w CCUS | View exact valueNG w CCUS | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Williams county | View exact valueWilliams county | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 2 Mt CO2 (24,000 barrels per day (bpd) of liquid hydrocarbon products from gas) | View exact value2 Mt CO2 (24,000 barrels per day (bpd) of liquid hydrocarbon products from gas) | IEA Hydrogen Projects dataset | — | — |
| Capacity (t CO₂ capt/y) | 2,000,000 t CO₂ capt/y | View exact value2000000 t CO₂ capt/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 13.4 kt H2/y | View exact value13.357271044701475 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
0 current sourced values · 5 older values · Record updated