completed · Germany · Allendorf (Eder)

BioPower2Gas-Anlage (Standort Allendorf(Eder)) is a hydrogen project in Allendorf (Eder), Germany; status: completed; recorded capacity: 15 (unit not recorded).

Overview

Statuscompleted
Country · regionGermany · Allendorf (Eder)
Technologypower-to-gas, biological methanation, PEM electrolysis
Productsynthetic methane / biomethane
Capacity15 (unit not recorded)

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Carbon Reduction4H2 + CO2 = CH4 + 2H2O; CO2 from biogas is converted to methane
Componentsbiogas plant, PEM electrolyzer, methanation unit / separate methane-production tank
Feedstockraw biogas CO2, water for electrolysis
Final Usenatural-gas grid, transport fuel, renewable heat
Power Sourcesurplus electricity from renewable energy sources
Project GroupBioPower2Gas research project
Project Typedemonstration plant within a research project

Capacity & economics

Production Volume15 (unit not recorded)

Status & timeline

Lifecycle Stagedemonstration
Eventfacility moved to Allendorf (Eder) in late 2014
Date online (tracker field)2013 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameAllendorf (Eder)

Additional project information

Progress StatusDemoInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
Capacity (kt H2/y)0.047 kt H2/yInternational Energy Agency · as of 2026
Capacity (MWel)0.312 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)60 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)60 Nm3 H2/hInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameBioPower2Gas-Anlage (Standort Allendorf(Eder))
View exact valueBioPower2Gas-Anlage (Standort Allendorf(Eder))
BioPower2Gas in Germany—
Site NameAllendorf (Eder)
View exact valueAllendorf (Eder)
Biological methanation demonstration plant in Allendorf, Germany—
Administrative AreaAllendorf (Eder)
View exact valueAllendorf (Eder)
Über das Projekt „BioPower2Gas“—
CountryGermany
View exact valueGermany
BioPower2Gas in Germany—
Carbon Reduction4H2 + CO2 = CH4 + 2H2O; CO2 from biogas is converted to methane
View exact value4H2 + CO2 = CH4 + 2H2O; CO2 from biogas is converted to methane
Biological methanation demonstration plant in Allendorf, Germany—
Componentsbiogas plant, PEM electrolyzer, methanation unit / separate methane-production tank
View exact value["biogas plant","PEM electrolyzer","methanation unit / separate methane-production tank"]
Über das Projekt „BioPower2Gas“—
Feedstockraw biogas CO2, water for electrolysis
View exact value["raw biogas CO2","water for electrolysis"]
Biological methanation demonstration plant in Allendorf, Germany—
Final Usenatural-gas grid, transport fuel, renewable heat
View exact value["natural-gas grid","transport fuel","renewable heat"]
Biological methanation demonstration plant in Allendorf, Germany—
Power Sourcesurplus electricity from renewable energy sources
View exact valuesurplus electricity from renewable energy sources
Über das Projekt „BioPower2Gas“—
Productsynthetic methane / biomethane
View exact valuesynthetic methane / biomethane
Über das Projekt „BioPower2Gas“—
Project GroupBioPower2Gas research project
View exact valueBioPower2Gas research project
Biological methanation demonstration plant in Allendorf, Germany—
Project Typedemonstration plant within a research project
View exact valuedemonstration plant within a research project
Biological methanation demonstration plant in Allendorf, Germany—
Technologypower-to-gas, biological methanation, PEM electrolysis
View exact value["power-to-gas","biological methanation","PEM electrolysis"]
Biological methanation demonstration plant in Allendorf, Germany—
Capacity15 (unit not recorded)
View exact value15
Biological methanation demonstration plant in Allendorf, Germany—
Production Volume15 (unit not recorded)
View exact value15
BioPower2Gas (site 1)—
Eventfacility moved to Allendorf (Eder) in late 2014
View exact valuefacility moved to Allendorf (Eder) in late 2014
Biological methanation demonstration plant in Allendorf, Germany—
EventDate online : 2013
View exact value{"date":"2013","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Lifecycle Stagedemonstration
View exact valuedemonstration
Biological Methanation Demonstration Plant in Allendorf, GermanyCurrent
Progress Statuscompleted
View exact valuecompleted
BioPower2Gas (site 1)—
Progress StatusDemo
View exact valueDEMO
IEA Hydrogen Projects dataset——
TechnologyPEM
View exact valuePEM
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)0.047 kt H2/y
View exact value0.046778400000000005 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (MWel)0.312 MWel
View exact value0.312 MWel
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)60 Nm³ H₂/h
View exact value60 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (Announced Size)60 Nm3 H2/h
View exact value60 Nm3 H2/h
IEA Hydrogen Projects dataset——

Record history

17 current sourced values · 1 older value · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.