H2Prism
Hydrogen calculators & data

AMpHytrite demonstrator, Port of Rotterdam, phase 1

Netherlands

Overview

StatusDemoInternational Energy Agency · as of 2026
Country · regionNetherlandsTopsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity10 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Componentselectrolyzer (PEM)Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)
Project GroupAmpHytriteTopsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)
Project Typehydrogen production facilityTopsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)

Capacity & economics

Financing3,968,952 EUR MOOI grant amount (confirmed, source-stated subsidy amount)Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)

Status & timeline

Date online (tracker field)2028 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameTweede Maasvlakte, RotterdamTopsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)
AliasAmpHytrite H2 DemonstratorTopsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)
Official NameAmpHytriteTopsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO)

Additional project information

Administrative AreaTweede Maasvlakte in Port of RotterdamInternational Energy Agency · as of 2026
CountryNetherlandsInternational Energy Agency · as of 2026
Capacity (Announced Size)10 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,923 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)1.5 kt H2/yInternational Energy Agency · as of 2026

Timeline

  1. Investment agreement signed : 2022-05-17Sif Group

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameAMpHytrite demonstrator, Port of Rotterdam, phase 1
View exact valueAMpHytrite demonstrator, Port of Rotterdam, phase 1
Sif, GE, and Pondera Team Up on Off-Grid Offshore Wind-to-Hydrogen Project | Offshore Wind Group 5Current
Site NameTweede Maasvlakte, Rotterdam
View exact valueTweede Maasvlakte, Rotterdam
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
AliasAmpHytrite H2 Demonstrator
View exact value[{"kind":"source_label","name":"AmpHytrite H2 Demonstrator"}]
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
CountryNetherlands
View exact valueNLD
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
Official NameAmpHytrite
View exact value[{"lang":"en","name":"AmpHytrite","evidence":["E-01"]}]
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
Componentselectrolyzer (PEM)
View exact value{"kind":"electrolyzer","tech":"PEM","tech_raw":"PEM electrolyzer","component_id":"CMP-1"}
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
Project GroupAmpHytrite
View exact value{"exists":true,"evidence":["E-03"],"group_name":"AmpHytrite","phase_name":null,"phase_order":null}
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200); Topsector Energie (https://topsectorenergie.nl/documents/1186/Poster_14_-_AmpHytrite_A1.pdf)Older value
TechnologyPEM
View exact valuePEM
IEA Hydrogen Projects dataset——
Capacity10 MW
View exact value10 MW
IEA Hydrogen Projects dataset——
Financing3,968,952 EUR MOOI grant amount (confirmed, source-stated subsidy amount)
View exact value{"unit":"EUR","basis":"source-stated subsidy amount","nature":"confirmed","number":3968952,"of_what":"MOOI grant amount"}
Topsector Energie, data from Rijksdienst voor Ondernemend Nederland (RVO) (https://projecten.topsectorenergie.nl/projecten/amphytrite-37456); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventInvestment agreement signed : 2022-05-17
View exact value{"date":"2022-05-17","tags":{"as_of":"2022-05","source":"Sif Group","evidence":["E-05"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00+09:00"},"ev_type":"EV-04","event_id":"V-01","raw_date_text":"May 17, 2022","date_precision":"day"}
Sif Group (https://sif-group.com/newsroom/sif-group-representing-kci-the-engineers-ge-renewable-energy-and-pondera-sign-an-mou-for-the-feasibility-study-of-a-green-hydrogen-centralized-offshore-wind-production-project-amphytrite-en/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventDate online : 2028
View exact value{"date":"2028","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusDemo
View exact valueDEMO
IEA Hydrogen Projects dataset——
Administrative AreaTweede Maasvlakte in Port of Rotterdam
View exact valueTweede Maasvlakte in Port of Rotterdam
IEA Hydrogen Projects dataset——
CountryNetherlands
View exact valueNetherlands
IEA Hydrogen Projects dataset——
Capacity (Announced Size)10 MW
View exact value10MW
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)1,923 Nm³ H₂/h
View exact value1923.076923076923 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)1.5 kt H2/y
View exact value1.4993076923076922 kt H2/y
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 14 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.