H2PrismHydrogen intelligenceSubscribe

Agios Efstratios - Green Island

0.1 MW · Electrolysis · Greece

Operational

Greece Map: Natural Earth
Capacity
0.1 MW
Target operation
—
Technology
Electrolysis
Country
Greece
Development stage
Operational

Country scale

#13 by recorded MW among 17 projects with capacity recorded in this country.

  1. Icarus300 MW
  2. Hellenic Hydrogen in Western Macedonia100 MW
  3. Agios Efstratios - Green Island0.1 MW

All stages are included. Capacity does not describe current production.

Project details

Operation start
2012
Purpose
Hybrid system for the production of electricity and heat from renewable energy sources, integrated with district/remote heating.
Production capacity
0.02 ktpa
Operating status
Commercial operation
Sources (9)
  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 2012

    Original value: Capacity (MWel): 0.1

    Original value: 0.1MW (Announced Size)

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 22.222222222222225 (Capacity (Nm³ H₂/h))

  • International Energy Agency

    International Energy Agency

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 2012

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 22.222222222222225 (Capacity (Nm³ H₂/h))

  • NEWS - Ai Stratis

    Ai Stratis - Green Island project website

    Original value: full-scale operation started in November 2025

    Original value: the system was commissioned for operation with the approval of HEDNO

    Original value: commissioned for operation

    Original value: Commercial operation

  • Proto Thema

    Proto Thema

    Original value: Operational testing of the Hybrid Station began in July 2025, while full-scale operation started in November of the same year.

  • How Agios Efstratios became a model energy island with up to 98% renewable power

    Proto Thema

    Original value: Operational testing of the Hybrid Station began in July 2025, while full-scale operation started in November of the same year.

  • Hybrid Energy Project of Ai Stratis (Ai Stratis Green Island)

    Hellenic Electricity Distribution Network Operator (HEDNO/DEDDIE)

    Original value: Hybrid system for the production of electricity and heat from renewable energy sources, integrated with district/remote heating.

  • Hellenic Electricity Distribution Network Operator (HEDNO/DEDDIE)

    Hellenic Electricity Distribution Network Operator (HEDNO/DEDDIE)

    Original value: Hybrid system for the production of electricity and heat from renewable energy sources, integrated with district/remote heating.

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: 0.017325333333333335 kt H2/y (Product: Hydrogen)

    Original value: 0.1 MW

    Original value: Power generation (End use: Power generation · Product: Hydrogen)

    Original value: Operational

    Original value: Hydrogen (Product: Hydrogen)

    Published value: 0.01733 kt H2/y

  • Ai Stratis - Green Island project website

    Ai Stratis - Green Island project website

    Original value: the system was commissioned for operation with the approval of HEDNO

    Original value: full-scale operation started in November 2025

    Original value: commissioned for operation

    Original value: Commercial operation

Projects in Greece

Major projects: operating and FID first, then by recorded capacity.

All projects in this country