Policy record
Integrated Austrian Grid Infrastructure Plan (ONIP), Final Version
Integrated Austrian Grid Infrastructure Plan (ONIP), Final Version policy record on H2Prism, with its status, summary, checked official source, and record date.
The official link is checked before a policy can appear here.
4 sourced values · 0 earlier records
Legal statusin_force
RelevancePartial relevance
Instrumentplanning
Policy details
SummaryHydrogen transmission is planned jointly with electricity and gas infrastructure, including a hydrogen start network from 2030 linking production, storage, industrial demand and international corridors.
Official source
| Source | Publisher | Checked |
|---|---|---|
| Open official source ↗ | Austrian Federal Ministry for Economic Affairs, Energy and Tourism | 2026-09-01T08:51:20Z |