The Dutch SDE++ 2026 regulation covers electrolysers of at least 500 kW through grid-connected and direct wind or solar connection routes.
Application window
Applications for subsidies under the 2026 regulation may be submitted from October 27, 2026, at 9:00, to November 26, 2026, at 17:00.
Sources
- [1] Ministerie van Klimaat en Groene Groei: Regeling aanwijzing categorieën duurzame energieproductie en klimaattransitie 2026, Staatscourant 2026, 25954
As of: 3 Aug 2026
Last confirmed: 17 Nov 2026
Electrolysis capacity threshold and connection routes
Article 73 provides subsidies on application to producers of hydrogen produced by an installation using water electrolysis with a nominal capacity of at least 500 kW.
The production installation must have either a connection linked to the electricity grid, or a direct connection to a production installation that produces electricity using wind energy or a production installation that produces electricity from sunlight by means of photovoltaic solar panels.
Article 6 requires the minister to reject an application if the same production installation has already received a subsidy under the scheme for scaling up fully renewable hydrogen production via electrolysis (Subsidieregeling opschaling volledig hernieuwbare waterstofproductie via elektrolyse) or the scheme for large-scale production of fully renewable hydrogen via electrolysis (Subsidieregeling grootschalige productie volledig hernieuwbare waterstof via elektrolyse).
Sources
- [1] Ministerie van Klimaat en Groene Groei: Regeling aanwijzing categorieën duurzame energieproductie en klimaattransitie 2026, Staatscourant 2026, 25954
As of: 3 Aug 2026
Last confirmed: 17 Nov 2026
European sustainability rules and electricity evidence
For grid-connected electrolysis installations, subsidies are granted only for fully renewable hydrogen that complies with Articles 4 to 8 and 11 of Delegated Regulation (EU) 2023/1184, and the renewable power purchase agreements referred to in Articles 5, 6 and 7 of that regulation must cover electricity from wind or solar energy.
For directly connected installations, subsidies are granted exclusively for fully renewable hydrogen that complies with Articles 3 and 8 of Delegated Regulation (EU) 2023/1184.
For directly connected installations, subsidies are granted exclusively for hydrogen produced with electricity produced by the directly connected wind or solar installation.
The subsidy recipient must hold proof of cancellation of guarantees of origin for sustainable electricity issued for wind or solar installations for which renewable power purchase agreements have been signed.
If non-fully renewable hydrogen is also produced in the installation, the greenhouse gas emissions reduction of all produced hydrogen combined must be at least 70%.
Sources
- [1] Ministerie van Klimaat en Groene Groei: Regeling aanwijzing categorieën duurzame energieproductie en klimaattransitie 2026, Staatscourant 2026, 25954
As of: 3 Aug 2026
Last confirmed: 17 Nov 2026
Support term and commissioning timeline
Article 74(1) provides that the subsidy referred to in Article 73(1) is granted for a period of 15 years.
The subsidy recipient must commission the production installation within five years after the date the subsidy award decision takes effect.
For an eligibility check, the first question is whether the plant connects to the grid or directly to wind or solar generation. The next question is which electricity evidence matches that route.
Sources
- [1] Ministerie van Klimaat en Groene Groei: Regeling aanwijzing categorieën duurzame energieproductie en klimaattransitie 2026, Staatscourant 2026, 25954
As of: 3 Aug 2026
Last confirmed: 17 Nov 2026
Related analyses
Explore related records
Research method
Research and writing were AI-assisted and reviewed before publication.