ZFI Uttar Pradesh 2.5 MW alkaline EAAS expansion
Alkaline
- Capacity
- —
- Target operation
- FY2026-27 Q3
- Technology
- Alkaline
- Country
- —
- Development stage
- —
Project details
- Site
- Uttar Pradesh expansion; exact site unreported. Dungri is equipment-manufacturing location
Sources (3)
- ZFI and Waaree: 2.5 MW EAAS agreement and separate 50 MW strategic MoU
Waaree Energies Limited · As of 2026-02-23
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: FY2026-27 Q3 (Operation event: operation start)
Original value: Uttar Pradesh expansion; exact site unreported. Dungri is equipment-manufacturing location (Site: Uttar Pradesh expansion; exact site unreported. Dungri is equipment-manufacturing location)
- Waaree Energies Limited
Waaree Energies Limited
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
- ZFI and Waaree: 2.5 MW EAAS agreement and separate 50 MW strategic MoU
Waaree Energies Limited
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Related projects
Projects sharing a recorded country or technology.