Tunisia’s hydrogen roadmap: renewable ammonia production by 2025
Feasibility
- Capacity
- —
- Target operation
- —
- Technology
- —
- Country
- —
- Development stage
- Feasibility
Project details
Sources (4)
- Tunisian Ministry of Industry, Mines and Energy
Tunisian Ministry of Industry, Mines and Energy
Original value: Feasibility
Original value: According to a MIME pre-feasibility study, the pilot project will include an 8 MW photovoltaic farm connected to the national grid, a seawater desalination unit, an electrolyzer and a Haber-Bosch synthesis unit.
- National Strategy for the Development of Green Hydrogen and its Derivatives in Tunisia
Tunisian Ministry of Industry, Mines and Energy
Original value: Feasibility
Original value: According to a MIME pre-feasibility study, the pilot project will include an 8 MW photovoltaic farm connected to the national grid, a seawater desalination unit, an electrolyzer and a Haber-Bosch synthesis unit.
- Ammonia Energy Association
Ammonia Energy Association
Original value: As part of the first steps, a commercial pilot project in Gabes on Tunisia's Mediterranean coast will produce electrolytic hydrogen and ammonia between 2025 and 2030.
- Tunisia's hydrogen roadmap: renewable ammonia production by 2025
Ammonia Energy Association
Original value: As part of the first steps, a commercial pilot project in Gabes on Tunisia's Mediterranean coast will produce electrolytic hydrogen and ammonia between 2025 and 2030.