H2PrismHydrogen intelligenceSubscribe

Tunisia’s hydrogen roadmap: renewable ammonia production by 2025

Feasibility

Capacity
—
Target operation
—
Technology
—
Country
—
Development stage
Feasibility

Project details

Sources (4)
  • Tunisian Ministry of Industry, Mines and Energy

    Tunisian Ministry of Industry, Mines and Energy

    Original value: Feasibility

    Original value: According to a MIME pre-feasibility study, the pilot project will include an 8 MW photovoltaic farm connected to the national grid, a seawater desalination unit, an electrolyzer and a Haber-Bosch synthesis unit.

  • National Strategy for the Development of Green Hydrogen and its Derivatives in Tunisia

    Tunisian Ministry of Industry, Mines and Energy

    Original value: Feasibility

    Original value: According to a MIME pre-feasibility study, the pilot project will include an 8 MW photovoltaic farm connected to the national grid, a seawater desalination unit, an electrolyzer and a Haber-Bosch synthesis unit.

  • Ammonia Energy Association

    Ammonia Energy Association

    Original value: As part of the first steps, a commercial pilot project in Gabes on Tunisia's Mediterranean coast will produce electrolytic hydrogen and ammonia between 2025 and 2030.

  • Tunisia's hydrogen roadmap: renewable ammonia production by 2025

    Ammonia Energy Association

    Original value: As part of the first steps, a commercial pilot project in Gabes on Tunisia's Mediterranean coast will produce electrolytic hydrogen and ammonia between 2025 and 2030.