Talara PHP hydrogen production unit
Operational
- Capacity
- —
- Target operation
- —
- Technology
- —
- Country
- —
- Development stage
- Operational
Project details
- Interruption
- Scheduled shutdown of PHP from 12.01.2026 to 11.02.2026
Sources (2)
- Petróleos del Perú – Petroperú S.A.
Petróleos del Perú – Petroperú S.A.
Original value: Parada Programada de PHP desde el 12.01.2026 hasta el 11.02.2026 (Source entity: PHP hydrogen unit)
Original value: March2026 operator report for period1January–24February states PHP in service producing approximately36000Nm3/h hydrogen after planned12January–11February outage for catalyst and refractory work. Rate not installed capacity or annual output.
Original value: Operational (Source entity: PHP hydrogen unit)
English rendering: Scheduled shutdown of PHP from 12.01.2026 to 11.02.2026
- State-owned enterprise management transfer report — March 2026
Petróleos del Perú – Petroperú S.A. · As of 2026-03
Original value: Parada Programada de PHP desde el 12.01.2026 hasta el 11.02.2026 (Source entity: PHP hydrogen unit)
Original value: March2026 operator report for period1January–24February states PHP in service producing approximately36000Nm3/h hydrogen after planned12January–11February outage for catalyst and refractory work. Rate not installed capacity or annual output.
Original value: Operational (Source entity: PHP hydrogen unit)
English rendering: Scheduled shutdown of PHP from 12.01.2026 to 11.02.2026