Rijeka oil refinery
Overview
StatusKey equipment delivery contract signed; construction completion expected in 2026 (reported 15 April 2024)
Country · regionCroatiaNPOO (Nacionalni plan oporavka i otpornosti)
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity10 MW
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
ComponentsElectrolyser (PEM)NPOO (Nacionalni plan oporavka i otpornosti)
Final UsePlanned use of green hydrogen in transportation
Power SourcePlanned solar power plant to partially supply the hydrogen production unit
Project Typehydrogen production facilityNPOO (Nacionalni plan oporavka i otpornosti)
Status & timeline
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Location & names
Site NameRijeka RefineryNPOO (Nacionalni plan oporavka i otpornosti)
AliasRijeka oil refineryNPOO (Nacionalni plan oporavka i otpornosti)
Local NameProjekt Vodik – proizvodnja obnovljivog vodika na lokaciji Rafinerije nafte RijekaNPOO (Nacionalni plan oporavka i otpornosti)
Official NameGreen Hydrogen Production Project at the Rijeka Refinery; Projekt Vodik – proizvodnja obnovljivog vodika na lokaciji Rafinerije nafte RijekaNPOO (Nacionalni plan oporavka i otpornosti)
Additional project information
Administrative AreaRijeka refineryInternational Energy Agency · as of 2026
CountryCroatiaInternational Energy Agency · as of 2026
Progress StatusFID / ConstructionInternational Energy Agency · as of 2026
Capacity (Announced Size)10 MWInternational Energy Agency · as of 2026
Capacity (MWel)10 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,923 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)1.5 kt H2/yInternational Energy Agency · as of 2026
Timeline
- Equipment ordered : 2024-04-15INA, d.d.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- NPOO (Nacionalni plan oporavka i otpornosti) NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732)
- INA, d.d. INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/)
- H2Prism earlier record (SRC-C-P200)
- INA INA signed contracts for new strategic projects related to renewable energy sources Shared by 4 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Rijeka oil refinery | View exact valueRijeka oil refinery | IEA Hydrogen Projects dataset | — | — |
| Site Name | Rijeka Refinery | View exact valueRijeka Refinery | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Alias | Rijeka oil refinery | View exact value[{"kind":"source_label","name":"Rijeka oil refinery"}] | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Country | Croatia | View exact valueHRV | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Local Name | Projekt Vodik – proizvodnja obnovljivog vodika na lokaciji Rafinerije nafte Rijeka | View exact valueProjekt Vodik – proizvodnja obnovljivog vodika na lokaciji Rafinerije nafte Rijeka | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Official Name | Green Hydrogen Production Project at the Rijeka Refinery; Projekt Vodik – proizvodnja obnovljivog vodika na lokaciji Rafinerije nafte Rijeka | View exact value[{"lang":"en","name":"Green Hydrogen Production Project at the Rijeka Refinery","evidence":["E-04"]},{"lang":"hr","name":"Projekt Vodik – proizvodnja obnovljivog vodika na lokaciji Rafinerije nafte Rijeka","evidence":["E-02"]}] | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Components | Electrolyser (PEM) | View exact value{"kind":"전해조","tech":"PEM","tech_raw":"elektrolizatora s protonski vodljivom membranom (PEMEL)","component_id":"CMP-1"} | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Final Use | Planned use of green hydrogen in transportation | View exact valuePlanned use of green hydrogen in transportation | INA signed contracts for new strategic projects related to renewable energy sources | — | |
| Power Source | Planned solar power plant to partially supply the hydrogen production unit | View exact valuePlanned solar power plant to partially supply the hydrogen production unit | INA signed contracts for new strategic projects related to renewable energy sources | — | |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Project Type | hydrogen production facility | View exact valuehydrogen_production_facility | NPOO (Nacionalni plan oporavka i otpornosti) (https://fondovieu.gov.hr/nabave/732); INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Technology | PEM | View exact valuePEM | IEA Hydrogen Projects dataset | — | — |
| Capacity | 10 MW | View exact value10 MW | INA signed contracts for new strategic projects related to renewable energy sources | — | |
| Event | Equipment ordered : 2024-04-15 | View exact value{"date":"2024-04-15","tags":{"as_of":"2024-04-15","source":"INA, d.d.","evidence":["E-03"],"judged_by":"worker_review","confidence":"high","accessed_at":"2026-08-18T01:40:46Z"},"ev_type":"EV-08","event_id":"V-01","raw_date_text":"15 April 2024","date_precision":"day"} | INA, d.d. (https://www.ina.hr/en/announcement/ina-signed-contracts-for-new-strategic-projects-related-to-renewable-energy-sources/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Event | Date online : 2027 | View exact value{"date":"2027","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Key equipment delivery contract signed; construction completion expected in 2026 (reported 15 April 2024) | View exact valueKey equipment delivery contract signed; construction completion expected in 2026 (reported 15 April 2024) | INA signed contracts for new strategic projects related to renewable energy sources | — | |
| Administrative Area | Rijeka refinery | View exact valueRijeka refinery | IEA Hydrogen Projects dataset | — | — |
| Country | Croatia | View exact valueCroatia | IEA Hydrogen Projects dataset | — | — |
| Progress Status | FID / Construction | View exact valueFID/Construction | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 10 MW | View exact value10MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 10 MWel | View exact value10 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 1,923 Nm³ H₂/h | View exact value1923.076923076923 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 1.5 kt H2/y | View exact value1.4993076923076922 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
4 current sourced values · 11 older values · Record updated