wind-solar green-electricity hydrogen production and liquefaction integrated project (hydrogen production and liquefaction portion)
Electrolysis · China
- Capacity
- —
- Target operation
- —
- Technology
- Electrolysis
- Country
- China
- Development stage
- —
Project details
- Site
- New industrial park in the Baotou Darhan Muminggan zero-carbon park
- Status
- Production/liquefaction portion filing reported
- Product
- Hydrogen
- Purpose
- Hydrogen production and liquefaction portion
Sources (3)
- Compiled by Tansuo Hydrogen
Compiled by Tansuo Hydrogen
Original value: New industrial park in the Baotou Darhan Muminggan zero-carbon park (Site: New industrial park in the Baotou Darhan Muminggan zero-carbon park)
Original value: Production/liquefaction portion filing reported
Original value: Wind (Electricity source: Wind)
Original value: Solar (Electricity source: Solar)
- Baotou: total investment of 6.5 billion yuan, and two green hydrogen projects are approved
Compiled by Tansuo Hydrogen · As of 2025-08-07
Original value: New industrial park in the Baotou Darhan Muminggan zero-carbon park (Site: New industrial park in the Baotou Darhan Muminggan zero-carbon park)
Original value: Production/liquefaction portion filing reported
Original value: Wind (Electricity source: Wind)
Original value: Hydrogen (Product: Hydrogen)
Original value: Electrolysis (Pathway: Electrolysis)
Original value: Hydrogen production and liquefaction portion
Original value: Solar (Electricity source: Solar)
Original value: Liquefaction (Pathway: Liquefaction)
- Baotou: total investment of 6.5 billion yuan, and two green hydrogen projects are approved
Compiled by Tansuo Hydrogen
Original value: 50,000-tonne-per-year production line for green-electricity water-electrolysis hydrogen production and hydrogen liquefaction (Capacity 1)
Original value: Water electrolysis (Technology: Water electrolysis)
Sources (3)
- Baotou: total investment of 6.5 billion yuan, and two green hydrogen projects are approved
Compiled by Tansuo Hydrogen
Original value: Location
- Compiled by Tansuo Hydrogen
Compiled by Tansuo Hydrogen
Original value: Location
- Baotou: total investment of 6.5 billion yuan, and two green hydrogen projects are approved
Compiled by Tansuo Hydrogen · As of 2025-08-07
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW