Xilingol Gemeng Duolun County integrated green-hydrogen, ammonia and methanol project
Alkaline, PEM · China
- Capacity
- —
- Target operation
- —
- Technology
- Alkaline, PEM
- Country
- China
- Development stage
- —
Project details
- Product
- Hydrogen
Sources (1)
- 131,700 tonnes of hydrogen per year! The Xilin Gol green-hydrogen ammonia and alcohol integrated project is to start construction in June
Hydrogen Opens the Future · As of 2026-01-28
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Hydrogen (Product: Hydrogen)
Sources (2)
- 131,700 tonnes of hydrogen per year! The Xilin Gol green-hydrogen ammonia and alcohol integrated project is to start construction in June
Hydrogen Opens the Future · As of 2026-01-28
Original value: Location
- Hydrogen Opens the Future
Hydrogen Opens the Future
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW