Hinggan League Jingneng coal-chemical renewable-energy green hydrogen substitution demonstration project
Alkaline · China
Under construction · counted as FID / Construction
- Capacity
- —
- Target operation
- 2026
- Technology
- Alkaline
- Country
- China
- Development stage
- Under construction · counted as FID / Construction
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Product
- Hydrogen
- Production capacity
- Annual hydrogen production of 2.6 ten-thousand tonnes (ten-thousand tonnes H2/year)
- Production pathway
- Electrolysis
- End use
- Chemicals
- Reported size
- Plans to install 60 alkaline electrolyzers of 1,000 standard cubic meters per hour
- Electricity source
- Wind
- Process description
- The hydrogen production station is equipped with 60 sets of 1000Nm3/h alkaline water-electrolysis hydrogen production equipment
Sources (8)
- Energy Sector
Energy Sector
Original value: Construction start reported April2024; current completion unverified
Original value: Plans to install 60 alkaline electrolyzers of 1,000 standard cubic meters per hour
Original value: Wind (Electricity source: Wind)
- Total investment of 3.6 billion yuan. The Xing'an League Jingneng coal-chemical renewable-energy green-hydrogen substitution demonstration project starts construction
Energy Sector · As of 2024-04-24
Original value: Construction start reported April2024; current completion unverified
Original value: 2026 (Operation event: Expected to be completed and enter production in 2026)
Original value: Hydrogen (Product: Hydrogen)
Original value: Demonstration
Original value: Chemicals (End use: Chemicals · Product: Hydrogen)
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Plans to install 60 alkaline electrolyzers of 1,000 standard cubic meters per hour
Original value: Wind (Electricity source: Wind)
- Hinggan League picks up speed and intensifies efforts as major project construction proceeds in full swing
Hinggan Daily · As of 2024-05-10
Original value: Under construction
- Total investment of 3.6 billion yuan. The Xing'an League Jingneng coal-chemical renewable-energy green-hydrogen substitution demonstration project starts construction
Energy Sector
Original value: On April 18, construction started on the Xing'an League Jingneng coal-chemical renewable-energy green-hydrogen substitution demonstration project
Original value: Production (Function: Production)
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Hydrogen (Product: Hydrogen)
- Xing'an League Jingneng Coal Chemical renewable-energy green hydrogen substitution demonstration project, hydrogen production section: public notice of the proposed approval opinion on the environmental impact assessment document
Xing'an League Ecology and Environment Bureau · As of 2025-05-08
Original value: Annual hydrogen production of 2.6 ten-thousand tonnes (ten-thousand tonnes H2/year) (Product: Hydrogen)
- Power Investment Information Network, 2023-11-06
Electric Power Investment Information Network
Original value: Electrolysis (Pathway: Electrolysis · Source entity: Jingneng Coal-to-Chemical Renewable Green Hydrogen Alternative Demonstration Project · CMP-2)
Original value: The hydrogen production station is equipped with 60 sets of 1000Nm3/h alkaline water-electrolysis hydrogen production equipment (Process section: electrolysis equipment configuration · Source entity: Jingneng Coal-to-Chemical Renewable Green Hydrogen Alternative Demonstration Project · CMP-2)
- Electric Power Investment Information Network
Electric Power Investment Information Network
Original value: Electrolysis (Pathway: Electrolysis · Source entity: Jingneng Coal-to-Chemical Renewable Green Hydrogen Alternative Demonstration Project · CMP-2)
Original value: The hydrogen production station is equipped with 60 sets of 1000Nm3/h alkaline water-electrolysis hydrogen production equipment (Process section: electrolysis equipment configuration · Source entity: Jingneng Coal-to-Chemical Renewable Green Hydrogen Alternative Demonstration Project · CMP-2)
- Electric Power Investment Information Network
Electric Power Investment Information Network · As of 2023-11-06
Original value: Electrolysis (Pathway: Electrolysis · Source entity: Jingneng Coal-to-Chemical Renewable Green Hydrogen Alternative Demonstration Project · CMP-2)
Original value: The hydrogen production station is equipped with 60 sets of 1000Nm3/h alkaline water-electrolysis hydrogen production equipment (Process section: electrolysis equipment configuration · Source entity: Jingneng Coal-to-Chemical Renewable Green Hydrogen Alternative Demonstration Project · CMP-2)
Sources (2)
- Total investment of 3.6 billion yuan. The Xing'an League Jingneng coal-chemical renewable-energy green-hydrogen substitution demonstration project starts construction
Energy Sector · As of 2024-04-24
Original value: Location
- Energy Sector
Energy Sector
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW