H2PrismHydrogen intelligenceSubscribe

Yinyan integrated hydrogen production and refueling station

Alkaline

Capacity
—
Target operation
—
Technology
Alkaline electrolyser
Country
—
Development stage
—

Project details

Refuelling capacity
2,000 kg/day
Reported size
2 alkaline electrolyzers, each with a hydrogen production capacity of 500Nm3/h
Site
Tianfu Yitong Logistics Park, No. 506 Yinyan Road, Shihezi, Eighth Division of the Xinjiang Production and Construction Corps
Electricity source
Solar
Status
Maintenance procurement covers commissioning,trial andoperation; noCOD proof
Sources (3)
  • Tender announcement (2nd round) for the open tender for inspection, maintenance and upkeep services for the Yinyan integrated hydrogen production and refueling station of Xinjiang Electric Power Guohua New Energy

    CHN Energy e-tender

    Original value: Production (Function: Production)

    Original value: Hydrogen (Product: Hydrogen)

  • Tender announcement (2nd round) for the open tender for inspection, maintenance and upkeep services for the Yinyan integrated hydrogen production and refueling station of Xinjiang Electric Power Guohua New Energy

    CHN Energy e-tender · As of 2025-03-07

    Original value: The hydrogenation capacity of the hydrogenation unit is 2000 kg/d (12 h) (Process section: Final use)

    Original value: Tendering (Procurement target: Tender announcement (2nd round) for the open tender for inspection, maintenance and upkeep services for the Yinyan integrated hydrogen production and refueling station of Xinjiang Electric Power Guohua New Energy)

    Original value: 2,000 kg/d

    Original value: Yinyan integrated hydrogen production and refueling station (Process section: product)

    Original value: 2 alkaline electrolyzers, each with a hydrogen production capacity of 500Nm3/h (2 alkaline electrolyzers, each with a hydrogen production capacity of 500Nm3/h)

    Original value: Tianfu Yitong Logistics Park, No. 506 Yinyan Road, Shihezi, Eighth Division of the Xinjiang Production and Construction Corps (Site: Tianfu Yitong Logistics Park, No. 506 Yinyan Road, Shihezi, Eighth Division of the Xinjiang Production and Construction Corps)

    Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)

    Original value: Solar (Electricity source: Solar)

    Original value: Maintenance procurement covers commissioning,trial andoperation; noCOD proof

    Original value: Yinyan integrated hydrogen production and refueling station (Process section: Project type)

    Original value: Refuelling (Function: Refuelling)

  • CHN Energy e-tender

    CHN Energy e-tender

    Original value: 2 alkaline electrolyzers, each with a hydrogen production capacity of 500Nm3/h (2 alkaline electrolyzers, each with a hydrogen production capacity of 500Nm3/h)

    Original value: Maintenance procurement covers commissioning,trial andoperation; noCOD proof

Related projects

Projects sharing a recorded country or technology.