Jinta Guangdong Hydropower 7MW photovoltaic off-grid integrated hydrogen production, storage and transmission demonstration project
Alkaline · China
- Capacity
- —
- Target operation
- 2026
- Technology
- Alkaline electrolyser
- Country
- China
- Development stage
- —
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Status
- EPC award and later equipment supply signing reported; operation unverified
- Site
- Within Jinta County, Gansu
Sources (6)
- A 7 MW green hydrogen project! Qingqi Shidai signs with Guangdong Hydropower
Century New Energy Network / Hydrogen Energy Observation · As of 2026-05-11
Original value: EPC award and later equipment supply signing reported; operation unverified
Original value: Solar (Electricity source: Solar)
Original value: Photovoltaic + hydrogen production + hydrogen storage (Process section: Power source)
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
- Century New Energy Network / Hydrogen Energy Observation
Century New Energy Network / Hydrogen Energy Observation
Original value: EPC award and later equipment supply signing reported; operation unverified
- Guangdong Hydropower off-grid hydrogen production project, planned to enter production in June 2026
Compiled by Hydrogen Energy Network · As of 2026-01-21
Original value: 30 June 2026 (Operation event: Planned to generate electricity and achieve hydrogen production, storage and transmission by 30 June 2026)
Original value: Within Jinta County, Gansu (Site: Within Jinta County, Gansu)
Original value: Selected (Procurement target: Guangdong Hydropower off-grid hydrogen production project, planned to enter production in June 2026)
Original value: Jinta Guangdong Hydropower 7MW photovoltaic off-grid integrated hydrogen production, storage and transmission demonstration project (Process section: product)
- Compiled by Hydrogen Energy Network
Compiled by Hydrogen Energy Network
Original value: Within Jinta County, Gansu (Site: Within Jinta County, Gansu)
- A 7 MW green hydrogen project! Qingqi Shidai signs with Guangdong Hydropower
Century New Energy Network / Hydrogen Energy Observation
Original value: Solar (Electricity source: Solar)
- Guangdong Hydropower off-grid hydrogen production project, planned to enter production in June 2026
Compiled by Hydrogen Energy Network
Original value: Hydrogen (Product: Hydrogen)
Sources (2)
- Guangdong Hydropower off-grid hydrogen production project, planned to enter production in June 2026
Compiled by Hydrogen Energy Network · As of 2026-01-21
Original value: Location
- Compiled by Hydrogen Energy Network
Compiled by Hydrogen Energy Network
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW