H2PrismHydrogen intelligenceSubscribe

Water-electrolysis hydrogen station works for the Otog Front Banner integrated wind-solar hydrogen and green ammonia synthesis project

AEM, Alkaline, PEM · China

China Map: Natural Earth
Capacity
—
Target operation
—
Technology
AEM, Alkaline, PEM
Country
China
Development stage
—

Project details

Electricity source
Renewable
Purpose
Water-electrolysis hydrogen production station works of the integrated wind-solar hydrogen production and green ammonia synthesis project
End use
Chemicals
Production pathway
Electrolysis
Sources (2)
  • PEM + ALK + AEM! Filing of the water-electrolysis hydrogen station works for the Shenneng Beifang Etuoke Qianqi wind-solar hydrogen production project - Market developments - Qingqi Weilai

    Hydrogen Opens the Future · As of 2026-04-29

    Original value: Renewable (Electricity source: Renewable)

    Original value: ~20,000 t/year (Product: Hydrogen)

    Original value: Water-electrolysis hydrogen production station works of the integrated wind-solar hydrogen production and green ammonia synthesis project

    Original value: PEM electrolyser (Technology: PEM electrolyser)

    Original value: Chemicals (End use: Chemicals · Product: Hydrogen)

    Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)

    Original value: Hydrogen (Product: Hydrogen)

    Original value: AEM electrolyser (Technology: AEM electrolyser)

    Original value: Electrolysis (Pathway: Electrolysis)

  • PEM + ALK + AEM! Filing of the water-electrolysis hydrogen station works for the Shenneng Beifang Etuoke Qianqi wind-solar hydrogen production project - Market developments - Qingqi Weilai

    Hydrogen Opens the Future

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Construction starts in December 2026 and is to be completed in two years

    Original value: It is proposed to build an annual green hydrogen output of about 20,000 tonnes (Planned hydrogen output)

Projects in China

Major projects: operating and FID first, then by recorded capacity.

All projects in this country