Project for integration of key hydrogen technologies and a demonstration park
Electrolysis
Operational
- Capacity
- —
- Target operation
- —
- Technology
- Electrolysis
- Country
- —
- Development stage
- Operational
Project details
- Purpose
- Project for integration of key hydrogen technologies and a demonstration park
- End use
- Power generation
- Electricity source
- Solar
- Reported size
- Newly build one 100 Nm3/h PEM (proton exchange membrane) hydrogen production facility and one 100 Nm3/h AEM (anion exchange membrane) hydrogen production facility, with supporting solid-state hydrogen storage (maximum storage of 48 kg). Under the project plan, the cumulative operating time of the PEM unit by 2025 is 3,500 h and that of the AEM unit is 300 h; after those operating times are reached, demonstration operation will be carried out as needed.
- Production pathway
- Electrolysis
Sources (5)
- The "Hydrogen into Ten Thousand Homes" demonstration project was put into operation in Huantai, Zibo
Lightning News via Tanso Hydrogen Network · As of 2023-11-17
Original value: Project for integration of key hydrogen technologies and a demonstration park
Original value: Power generation (End use: Power generation · Product: Hydrogen)
Original value: Solar (Electricity source: Solar)
Original value: Operational
Original value: A two-track layout of green hydrogen and grey hydrogen (Process section: A two-track layout of green hydrogen and grey hydrogen)
Original value: Electrolysis (Pathway: Electrolysis)
Original value: Integrated energy supply (Process section: Integrated energy supply)
Original value: Demonstration
Original value: Project operation ceremony reported November15 2023; no current operation measurement
- The "Hydrogen into Ten Thousand Homes" demonstration project was put into operation in Huantai, Zibo
Lightning News via Tanso Hydrogen Network
Original value: On November 15, the operation ceremony of the Dongyue "Hydrogen into 10,000 Homes" project was held in Huantai, Zibo
Original value: Water electrolysis (Technology: Water electrolysis)
- Zibo Municipal Ecology and Environment Bureau
Zibo Municipal Ecology and Environment Bureau
Original value: Newly build one 100 Nm3/h PEM (proton exchange membrane) hydrogen production facility and one 100 Nm3/h AEM (anion exchange membrane) hydrogen production facility, with supporting solid-state hydrogen storage (maximum storage of 48 kg). Under the project plan, the cumulative operating time of the PEM unit by 2025 is 3,500 h and that of the AEM unit is 300 h; after those operating times are reached, demonstration operation will be carried out as needed.
- Approval opinion on the environmental impact report for the hydrogen energy park key-technology integration and demonstration project of Shandong Dongyue Research Institute Co., Ltd.
Zibo Municipal Ecology and Environment Bureau · As of 2023-11-08
Original value: Newly build one 100 Nm3/h PEM (proton exchange membrane) hydrogen production facility and one 100 Nm3/h AEM (anion exchange membrane) hydrogen production facility, with supporting solid-state hydrogen storage (maximum storage of 48 kg). Under the project plan, the cumulative operating time of the PEM unit by 2025 is 3,500 h and that of the AEM unit is 300 h; after those operating times are reached, demonstration operation will be carried out as needed.
- Lightning News via Tanso Hydrogen Network
Lightning News via Tanso Hydrogen Network
Original value: Project operation ceremony reported November15 2023; no current operation measurement