Integrated demonstration project for new-energy hydrogen production coproducing carbon-free fuel, with supporting wind and solar power generation
Alkaline
FID / Construction
- Capacity
- —
- Target operation
- —
- Technology
- Alkaline
- Country
- —
- Development stage
- FID / Construction
Project details
- Interruption
- The project failed to start construction on schedule
- Product
- Hydrogen
Sources (4)
- Three years of setbacks, and the principal entity changed hands! Huadian takes over the green hydrogen project, and it changes again!
Century New Energy Network · As of 2026-09-18
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: FID / Construction
Original value: Revised approval reported; current physical operation unverified
Original value: Hydrogen (Product: Hydrogen)
- Century New Energy Network
Century New Energy Network
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Revised approval reported; current physical operation unverified
Original value: Hydrogen (Product: Hydrogen)
- Three years of setbacks, and the principal entity changed hands! Huadian takes over the green hydrogen project, and it changes again!
Century New Energy Network
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: The unit's annual hydrogen output is 28,000 tonnes (Hydrogen design annual)
Original value: Agreed to change the construction content and the investment amount
- Total investment of 3.589 billion yuan! An Inner Mongolia green hydrogen project is postponed
Century New Energy Network · As of 2025-10-15
Original value: The project failed to start construction on schedule (Interruption event: Huadian Tuoyang Darhan Muminggan Banner hydrogen production / The project failed to start construction on schedule)
Related projects