H2PrismHydrogen intelligenceSubscribe

Wildfire Energy Pinkenba MIHG pilot hydrogen separation

· Australia

Operational

Australia Map: Natural Earth
Capacity
—
Target operation
—
Technology
—
Country
Australia
Development stage
Operational

Project details

Sources (3)
  • Pilot Plant

    Wildfire Energy

    Original value: 2023

    Original value: Research or pilot

    Original value: gas blower

    Original value: electrostatic precipitator

    Original value: MIHG gasification (Process section: /process)

    Original value: adsorbent bed

    Original value: MIHG reactor

    Original value: gas cooler

  • Site Tour: Wildfire Energy Plant 2025

    IChemE

    Original value: operation of the pilot plant

    Original value: 10 First St, Pinkenba, Brisbane; R&D facility at former BP refinery (Site: 10 First St, Pinkenba, Brisbane; R&D facility at former BP refinery)

    Original value: Operational

    Original value: IChemE describes pilot operation, sampling and testing; manufacturer reports built and upgraded

    Original value: Pinkenba (Site: Pinkenba)

  • IChemE

    IChemE

    Original value: IChemE describes pilot operation, sampling and testing; manufacturer reports built and upgraded

Projects in Australia

Major projects: operating and FID first, then by recorded capacity.

All projects in this country