Industrialization project for biomass green hydrogen and bio-based materials

· China

Cancelled

China Map: Natural Earth
Capacity
—
Target operation
—
Technology
—
Country
China
Development stage
Cancelled

Project details

Site
Dalad Banner Economic Development Zone, Ordos
Product
Hydrogen
Reported size
Annual output of 65,000 tonnes of green hydrogen and 300,000 tonnes of biomass alloy slurry
Purpose
Industrialization project for biomass green hydrogen and bio-based materials
Sources (4)
  • A 65,000-tonne green hydrogen project in Inner Mongolia was revoked!_Century New Energy Network

    Century New Energy Network · As of 2026-08-31

    Original value: Filing withdrawal reported; not operating

    Original value: Dalad Banner Economic Development Zone, Ordos (Site: Dalad Banner Economic Development Zone, Ordos)

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Annual output of 65,000 tonnes of green hydrogen and 300,000 tonnes of biomass alloy slurry

    Original value: Industrialization project for biomass green hydrogen and bio-based materials

    Original value: 65,000 t/year (Product: Hydrogen)

  • Century New Energy Network

    Century New Energy Network

    Original value: Filing withdrawal reported; not operating

  • A 65,000-tonne green hydrogen project in Inner Mongolia was revoked!_Century New Energy Network

    Century New Energy Network

    Original value: The document agrees to revoke the industrialization project for biomass green hydrogen and bio-based materials

  • Inner Mongolia's 65,000-tonne green hydrogen project cancelled!

    Tansuo Energy Storage Network · As of 2026-09-01

    Original value: Cancelled