East Hope Zhundong coal-to-olefins coupled with water-electrolysis hydrogen production
Electrolysis
FID / Construction
- Capacity
- —
- Target operation
- 2026
- Technology
- Electrolysis
- Country
- —
- Development stage
- FID / Construction
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Product
- Methanol · Hydrogen · Oxygen
- Reported size
- 20,000 t/a water-electrolysis hydrogen production unit
- Electricity source
- Solar
- Site
- East Hope Zhundong Park
- End use
- Chemicals
Sources (3)
- 20,000 Nm3/h hydrogen production from water; the Xinjiang demonstration project coupling green hydrogen with coal chemicals has started construction
Energy Sector · As of 2023-12-27
Original value: Methanol (Product: Methanol)
Original value: Hydrogen (Product: Hydrogen)
Original value: Oxygen (Product: Oxygen)
Original value: 20,000 t/a water-electrolysis hydrogen production unit
Original value: Solar (Electricity source: Solar)
Original value: East Hope Zhundong Park (Site: East Hope Zhundong Park)
Original value: April 2024
Original value: FID / Construction
Original value: April 2026 (Operation event: The proposed construction period is 24 months, with construction planned to start in April 2024 and completion in April 2026)
Original value: Project groundbreaking ceremony reportedDec26; separate plan saysApr2024 start andApr2026 completion
Original value: Chemicals (End use: Chemicals · Product: Hydrogen)
- Energy Sector
Energy Sector
Original value: 20,000 t/a water-electrolysis hydrogen production unit
Original value: East Hope Zhundong Park (Site: East Hope Zhundong Park)
Original value: Project groundbreaking ceremony reportedDec26; separate plan saysApr2024 start andApr2026 completion
- 20,000 Nm3/h hydrogen production from water; the Xinjiang demonstration project coupling green hydrogen with coal chemicals has started construction
Energy Sector
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: On December 26, the groundbreaking ceremony for the East Hope 800,000-tonne coal-to-olefins project was held at East Hope Zhundong Park in Xinjiang