East Hope Zhundong coal-to-olefins coupled with water-electrolysis hydrogen production

Electrolysis

FID / Construction

Capacity
—
Target operation
2026
Technology
Electrolysis
Country
—
Development stage
FID / Construction

Target operation

2026Target operation
  1. 2024
  2. 2025
  3. 2026
  4. 2027
  5. 2028

Target year as recorded for this project. The axis does not imply stage history.

Project details

Product
Methanol · Hydrogen · Oxygen
Reported size
20,000 t/a water-electrolysis hydrogen production unit
Electricity source
Solar
Site
East Hope Zhundong Park
End use
Chemicals
Sources (3)
  • 20,000 Nm3/h hydrogen production from water; the Xinjiang demonstration project coupling green hydrogen with coal chemicals has started construction

    Energy Sector · As of 2023-12-27

    Original value: Methanol (Product: Methanol)

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Oxygen (Product: Oxygen)

    Original value: 20,000 t/a water-electrolysis hydrogen production unit

    Original value: Solar (Electricity source: Solar)

    Original value: East Hope Zhundong Park (Site: East Hope Zhundong Park)

    Original value: April 2024

    Original value: FID / Construction

    Original value: April 2026 (Operation event: The proposed construction period is 24 months, with construction planned to start in April 2024 and completion in April 2026)

    Original value: Project groundbreaking ceremony reportedDec26; separate plan saysApr2024 start andApr2026 completion

    Original value: Chemicals (End use: Chemicals · Product: Hydrogen)

  • Energy Sector

    Energy Sector

    Original value: 20,000 t/a water-electrolysis hydrogen production unit

    Original value: East Hope Zhundong Park (Site: East Hope Zhundong Park)

    Original value: Project groundbreaking ceremony reportedDec26; separate plan saysApr2024 start andApr2026 completion

  • 20,000 Nm3/h hydrogen production from water; the Xinjiang demonstration project coupling green hydrogen with coal chemicals has started construction

    Energy Sector

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: On December 26, the groundbreaking ceremony for the East Hope 800,000-tonne coal-to-olefins project was held at East Hope Zhundong Park in Xinjiang