PosHYdon
1 MW
Operational
- Capacity
- 1 MW
- Target operation
- Q4 2024
- Technology
- —
- Country
- —
- Development stage
- Operational
Also known as PosHYdon Q13a-A offshore hydrogen pilot
Target operation
- 2022
- 2023
- 2024
- 2025
- 2026
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Operating status
- Commissioning
- Scale
- Demonstration
Sources (6)
- PosHYdon onshore test kicks off successfully
PosHYdon consortium · As of 2024-05-08
Original value: blend with gas and transport to coast through existing pipeline
Original value: onshore test
Original value: Q4 2024 (Operation event: operation start)
Original value: Luchterduinen wind farm
Original value: Commissioning
- PosHYdon consortium
PosHYdon consortium
Original value: Consortium reports successful offshore hydrogen production by the release date; test phase, not commercial continuous service.
Original value: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea (Site: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea)
- PosHYdon first production of green hydrogen on operational North Sea platform
PosHYdon consortium · As of 2026-07-22
Original value: Consortium reports successful offshore hydrogen production by the release date; test phase, not commercial continuous service.
Original value: Operational
Original value: Q13a-A (Site: Q13a-A)
Original value: successfully produced
Original value: seawater to demineralised water before electrolysis
Original value: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea (Site: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Netherlands offshore, North Sea (Site: Netherlands offshore, North Sea)
Original value: Gas grid injection (End use: Gas grid injection · Product: Synthetic methane)
Original value: Demonstration
Original value: 1 MW
- PosHYdon onshore test kicks off successfully
PosHYdon consortium
Original value: Planned hydrogen is to be blended with gas and transported to the coast through the existing gas pipeline. (Process section: planned product blending and existingpipeline export)
- PosHYdon first production of green hydrogen on operational North Sea platform
PosHYdon consortium
Original value: successfully produced