PosHYdon

1 MW

Operational

Capacity
1 MW
Target operation
Q4 2024
Technology
—
Country
—
Development stage
Operational

Also known as PosHYdon Q13a-A offshore hydrogen pilot

Target operation

2024Target operation
  1. 2022
  2. 2023
  3. 2024
  4. 2025
  5. 2026

Target year as recorded for this project. The axis does not imply stage history.

Project details

Operating status
Commissioning
Scale
Demonstration
Sources (6)
  • PosHYdon onshore test kicks off successfully

    PosHYdon consortium · As of 2024-05-08

    Original value: blend with gas and transport to coast through existing pipeline

    Original value: onshore test

    Original value: Q4 2024 (Operation event: operation start)

    Original value: Luchterduinen wind farm

    Original value: Commissioning

  • PosHYdon consortium

    PosHYdon consortium

    Original value: Consortium reports successful offshore hydrogen production by the release date; test phase, not commercial continuous service.

    Original value: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea (Site: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea)

  • PosHYdon first production of green hydrogen on operational North Sea platform

    PosHYdon consortium · As of 2026-07-22

    Original value: Consortium reports successful offshore hydrogen production by the release date; test phase, not commercial continuous service.

    Original value: Operational

    Original value: Q13a-A (Site: Q13a-A)

    Original value: successfully produced

    Original value: seawater to demineralised water before electrolysis

    Original value: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea (Site: Q13a-A platform, approximately 13 km off Scheveningen, Dutch North Sea)

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Netherlands offshore, North Sea (Site: Netherlands offshore, North Sea)

    Original value: Gas grid injection (End use: Gas grid injection · Product: Synthetic methane)

    Original value: Demonstration

    Original value: 1 MW

  • PosHYdon onshore test kicks off successfully

    PosHYdon consortium

    Original value: Planned hydrogen is to be blended with gas and transported to the coast through the existing gas pipeline. (Process section: planned product blending and existingpipeline export)

  • PosHYdon first production of green hydrogen on operational North Sea platform

    PosHYdon consortium

    Original value: successfully produced