Jarud Banner integrated wind-solar hydrogen production project
Alkaline · China
- Capacity
- —
- Target operation
- —
- Technology
- Alkaline
- Country
- China
- Development stage
- —
Project details
- Electricity source
- Renewable
- Product
- Hydrogen
- Function
- Production
- Site
- Chemical concentration zone of Lubei Industrial Park, Jarud Banner, Tongliao
Sources (3)
- 32 sets of 1000 Nm3/h electrolyzers! The Inner Mongolia Jinchu Energy Investment New Energy wind-solar hydrogen production integrated project obtained filing
Energy Sector · As of 2024-10-19
Original value: Renewable (Electricity source: Renewable)
Original value: Hydrogen (Product: Hydrogen)
Original value: May 2025
Original value: Production (Function: Production)
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Chemical concentration zone of Lubei Industrial Park, Jarud Banner, Tongliao (Site: Chemical concentration zone of Lubei Industrial Park, Jarud Banner, Tongliao)
Original value: Filing accepted reportedOct2024; nooperationproof
- Energy Sector
Energy Sector
Original value: Renewable (Electricity source: Renewable)
Original value: Chemical concentration zone of Lubei Industrial Park, Jarud Banner, Tongliao (Site: Chemical concentration zone of Lubei Industrial Park, Jarud Banner, Tongliao)
Original value: Filing accepted reportedOct2024; nooperationproof
- 32 sets of 1000 Nm3/h electrolyzers! The Inner Mongolia Jinchu Energy Investment New Energy wind-solar hydrogen production integrated project obtained filing
Energy Sector
Original value: Successfully passed filing
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Sources (2)
- Energy Sector
Energy Sector
Original value: Location
- 32 sets of 1000 Nm3/h electrolyzers! The Inner Mongolia Jinchu Energy Investment New Energy wind-solar hydrogen production integrated project obtained filing
Energy Sector · As of 2024-10-19
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW