H2PrismHydrogen intelligenceSubscribe

Hazer Commercial Demonstration Plant, Woodman Point

On hold

Capacity
—
Target operation
—
Technology
—
Country
—
Development stage
On hold

Project details

Sources (4)
  • Commercial Demonstration Plant performance test program successfully completed

    Hazer Group Limited · As of 2024-11-19

    Original value: On hold

    Original value: CDP warm stacked after completing current test program; next reactor integration engineering underway.

    Original value: warm stacked

  • The Hazer Process: Maximising the value of biogas through low emission hydrogen and graphite products

    Hazer Group Limited; hosted by ARENA

    Original value: Woodman (Site: Woodman)

    Original value: Water Corporation WRRF, Woodman Point, Munster, Western Australia (Site: Water Corporation WRRF, Woodman Point, Munster, Western Australia)

    Original value: heat and iron ore/iron oxide catalytic methane decomposition (Process section: /process)

  • Hazer Group Limited

    Hazer Group Limited

    Original value: CDP warm stacked after completing current test program; next reactor integration engineering underway.

  • Hazer Group Limited; hosted by ARENA

    Hazer Group Limited; hosted by ARENA

    Original value: Water Corporation WRRF, Woodman Point, Munster, Western Australia (Site: Water Corporation WRRF, Woodman Point, Munster, Western Australia)