Phase I of the Chayou Qianqi wind-solar hydrogen production integrated project of Gemeng Yihe Xinnengyuan Youxian Zeren Gongsi
PEM · China
- Capacity
- —
- Target operation
- —
- Technology
- PEM
- Country
- China
- Development stage
- —
Project details
- Product
- Hydrogen
- Process description
- complete equipment for a 35 kV switching station
- Reported size
- Rated hydrogen output of 9000Nm³/h, and maximum hydrogen output of 10800Nm³/h
- Electricity source
- Wind
- Site
- Qahar Right Front Banner, Ulanqab, Inner Mongolia
- Function
- Production
Sources (6)
- Quoted price of 144 million! Public notice of the winning-bid candidates for 36 sets of 250 Nm3/h PEM electrolyzers
Century New Energy Network / Hydrogen Energy Observation · As of 2026-10-09
Original value: Hydrogen (Product: Hydrogen · Source entity: Gemeng Yihe Chahar Right Front Banner hydrogen production, phase 1)
Original value: Rated hydrogen output of 9000Nm³/h, and maximum hydrogen output of 10800Nm³/h
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Wind (Electricity source: Wind · Source entity: Gemeng Yihe Chahar Right Front Banner hydrogen production, phase 1)
Original value: PEM electrolyser (Source entity: Gemeng Yihe Chahar Right Front Banner hydrogen production, phase 1 · Technology: PEM electrolyser)
Original value: Qahar Right Front Banner, Ulanqab, Inner Mongolia (Source entity: Phase I of the Chayou Qianqi wind-solar hydrogen production integrated project of Gemeng Yihe Xinnengyuan Youxian Zeren Gongsi · Site: Qahar Right Front Banner, Ulanqab, Inner Mongolia)
Original value: Qahar Right Front Banner, Ulanqab, Inner Mongolia (Site: Qahar Right Front Banner, Ulanqab, Inner Mongolia)
Original value: Production (Function: Production · Source entity: Gemeng Yihe Chahar Right Front Banner hydrogen production, phase 1)
- Qingqi Weilai / Inner Mongolia Public Service Platform for Tendering and Bidding
Qingqi Weilai / Inner Mongolia Public Service Platform for Tendering and Bidding
Original value: Equipment award reportedOct12 2026; notinstalledoroperating
- 143.958 million! Xingran Technology won the bid for the procurement project for the complete hydrogen-production-end equipment package of the Chayouqian Banner wind-solar hydrogen production project
Qingqi Weilai / Inner Mongolia Public Service Platform for Tendering and Bidding · As of 2026-10-12
Original value: Equipment award reportedOct12 2026; notinstalledoroperating
Original value: complete equipment for a 35 kV switching station (Process section: Equipment scope · Source entity: Gemeng Yihe Chahar Right Front Banner hydrogen production, phase 1)
Original value: Selected (Procurement target: 143.958 million! Xingran Technology won the bid for the procurement project for the complete hydrogen-production-end equipment package of the Chayouqian Banner wind-solar hydrogen production project)
- 143.958 million! Xingran Technology won the bid for the procurement project for the complete hydrogen-production-end equipment package of the Chayouqian Banner wind-solar hydrogen production project
Qingqi Weilai / Inner Mongolia Public Service Platform for Tendering and Bidding
Original value: Announcement of the winning (concluded) result for procurement of complete equipment for the hydrogen-production side of phase 1 of the Chahar Right Front Banner integrated wind-solar hydrogen production project of Inner Mongolia Gemeng Yihe New Energy Co., Ltd.
- Quoted price of 144 million! Public notice of the winning-bid candidates for 36 sets of 250 Nm3/h PEM electrolyzers
Century New Energy Network / Hydrogen Energy Observation
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Hydrogen (Product: Hydrogen)
Original value: Wind (Electricity source: Wind)
- Century New Energy Network / Hydrogen Energy Observation
Century New Energy Network / Hydrogen Energy Observation
Original value: Rated hydrogen output of 9000Nm³/h, and maximum hydrogen output of 10800Nm³/h
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Qahar Right Front Banner, Ulanqab, Inner Mongolia (Site: Qahar Right Front Banner, Ulanqab, Inner Mongolia)
Sources (2)
- Century New Energy Network / Hydrogen Energy Observation
Century New Energy Network / Hydrogen Energy Observation
Original value: Location
- Quoted price of 144 million! Public notice of the winning-bid candidates for 36 sets of 250 Nm3/h PEM electrolyzers
Century New Energy Network / Hydrogen Energy Observation · As of 2026-10-09
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW