Air Liquide Tianjin hydrogen supply base
· China
- Capacity
- —
- Target operation
- —
- Technology
- —
- Country
- China
- Development stage
- —
Project details
- Production pathway
- By-product hydrogen recovery
- Purpose
- Waste hydrogen
- Product
- Hydrogen
Sources (3)
- Air Liquide's hydrogen base, with an investment of 1 billion yuan, enters production
China Energy Net; attributed original: Tianjin Radio and Television Station
Original value: Formally entered production
Original value: Annual capacity reaches 3,000 tonnes (Capacity 1)
- Air Liquide's hydrogen base, with an investment of 1 billion yuan, enters production
China Energy Net; attributed original: Tianjin Radio and Television Station · As of 2025-07-29
Original value: By-product hydrogen recovery (Pathway: By-product hydrogen recovery)
Original value: Waste hydrogen
Original value: Production start reported 28 July 2025; no independent commissioning, customer receipt or 2026 operating verification
Original value: 2025
Original value: Hydrogen (Product: Hydrogen)
- China Energy Net; attributed original: Tianjin Radio and Television Station
China Energy Net; attributed original: Tianjin Radio and Television Station
Original value: Production start reported 28 July 2025; no independent commissioning, customer receipt or 2026 operating verification
Sources (2)
- Air Liquide's hydrogen base, with an investment of 1 billion yuan, enters production
China Energy Net; attributed original: Tianjin Radio and Television Station
Original value: Location
- Air Liquide's hydrogen base, with an investment of 1 billion yuan, enters production
China Energy Net; attributed original: Tianjin Radio and Television Station · As of 2025-07-29
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW