- Capacity
- —
- Target operation
- —
- Technology
- —
- Country
- China
- Development stage
- Operational
Project details
- Operating status
- Commissioning
Sources (2)
- 'Hydrogen' goes into action; carbon 'locks' in new energy
Fujian Provincial People's Government / Fujian Daily · As of 2026-10-17
Original value: Attempt to have the electrolyzer follow wind-power output with dynamic regulation (Process section: Attempt to have the electrolyzer follow wind-power output with dynamic regulation)
Original value: Real-world pilot testing reported; commercial COD not established
Original value: Operational
Original value: Commissioning
- Fujian Provincial People's Government / Fujian Daily
Fujian Provincial People's Government / Fujian Daily
Original value: Real-world pilot testing reported; commercial COD not established
Sources (3)
- 'Hydrogen' goes into action; carbon 'locks' in new energy
Fujian Provincial People's Government / Fujian Daily · As of 2026-10-17
Original value: Location
- Fujian Provincial People's Government / Fujian Daily
Fujian Provincial People's Government / Fujian Daily
Original value: Location
- 'Hydrogen' goes into action; carbon 'locks' in new energy
Fujian Provincial People's Government / Fujian Daily
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW