LONGi Urad Rear Banner wind-solar hydrogen production integrated project
· China
- Capacity
- —
- Target operation
- 2026
- Technology
- —
- Country
- China
- Development stage
- —
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Construction target
- 2025
Sources (3)
- Two wind-solar hydrogen production integrated projects in Urad Rear Banner were approved
Energy Sector · As of 2024-08-13
Original value: 2025
Original value: Energybureau approvalreported2024; futureproduction2026notverified
Original value: 2026 (Operation event: Construction planned to start in 2025 and production in 2026)
- Two wind-solar hydrogen production integrated projects in Urad Rear Banner were approved
Energy Sector
Original value: Design hydrogen production capacity of 54,000 tonnes/year
Original value: Design hydrogen production capacity of 54,000 tonnes/year (5.4 x 10,000 tonnes/year)
Original value: Two wind-solar hydrogen production integrated projects receive approval from the autonomous region's energy bureau
Original value: Hydrogen (Product: Hydrogen)
- Energy Sector
Energy Sector
Original value: Energybureau approvalreported2024; futureproduction2026notverified
Sources (2)
- Two wind-solar hydrogen production integrated projects in Urad Rear Banner were approved
Energy Sector · As of 2024-08-13
Original value: Location
- Energy Sector
Energy Sector
Original value: Location
Projects in China
Major projects: operating and FID first, then by recorded capacity.
- CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2Under construction1,280 MW
- Hydrogen Energy Metallurgical Chemical Demonstration Zone, phase 1FID / Construction750 MW
- Siziwang Banner projectFID / Construction531 MW
- Vision Tongliao Wind-Solar Power to Hydrogen-Ammonia-Methanol Integration ProjectFID / Construction478 MW
- Grove Hydrogen Energy Technology Group hydrogen projectFID / Construction472 MW