LONGi Urad Rear Banner wind-solar hydrogen production integrated project

· China

China Map: Natural Earth
Capacity
—
Target operation
2026
Technology
—
Country
China
Development stage
—

Target operation

2026Target operation
  1. 2024
  2. 2025
  3. 2026
  4. 2027
  5. 2028

Target year as recorded for this project. The axis does not imply stage history.

Project details

Construction target
2025
Sources (3)
  • Two wind-solar hydrogen production integrated projects in Urad Rear Banner were approved

    Energy Sector · As of 2024-08-13

    Original value: 2025

    Original value: Energybureau approvalreported2024; futureproduction2026notverified

    Original value: 2026 (Operation event: Construction planned to start in 2025 and production in 2026)

  • Two wind-solar hydrogen production integrated projects in Urad Rear Banner were approved

    Energy Sector

    Original value: Design hydrogen production capacity of 54,000 tonnes/year

    Original value: Design hydrogen production capacity of 54,000 tonnes/year (5.4 x 10,000 tonnes/year)

    Original value: Two wind-solar hydrogen production integrated projects receive approval from the autonomous region's energy bureau

    Original value: Hydrogen (Product: Hydrogen)

  • Energy Sector

    Energy Sector

    Original value: Energybureau approvalreported2024; futureproduction2026notverified

Projects in China