Mingyang Duolun Industrial Park wind-power hydrogen production integrated demonstration project

Electrolysis · China

China Map: Natural Earth
Capacity
—
Target operation
—
Technology
Water electrolysis
Country
China
Development stage
—

Project details

Purpose
Integrated wind-power hydrogen production demonstration project
Product
Hydrogen
Electricity source
Wind
Production pathway
Electrolysis
Production capacity
Construction scale: 0.35 ten-thousand tonnes of hydrogen production per year, synthesizing 20,000 tonnes of ammonia. (ten-thousand tonnes/year)
Sources (4)
  • Tansuo Hydrogen Network / compiled by Hydrogen Energy Network

    Tansuo Hydrogen Network / compiled by Hydrogen Energy Network

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: Amended project filing notice reported March1; planned2023-04/2024-09 schedule not achieved operation

  • 8000Nm³/h; a change to the filing of a wind-power hydrogen production project

    Tansuo Hydrogen Network / compiled by Hydrogen Energy Network · As of 2024-03-07

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 1 set of 2000 Nm3/h (Process section: 1 set of 2000 Nm3/h)

    Original value: 1 set of 1500 Nm³/h water-electrolysis hydrogen production electrolyzer (Process section: 1 set of 1500 Nm³/h water-electrolysis hydrogen production electrolyzer)

    Original value: Integrated wind-power hydrogen production demonstration project

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Duolun Industrial Park (Site: Duolun Industrial Park)

    Original value: Wind (Electricity source: Wind)

    Original value: Includes 2 sets of 2250 Nm³/h (Process section: Includes 2 sets of 2250 Nm³/h)

    Original value: Annual output of 3,530 tonnes of green hydrogen

    Original value: Electrolysis (Pathway: Electrolysis)

    Original value: Demonstration

    Original value: Amended project filing notice reported March1; planned2023-04/2024-09 schedule not achieved operation

  • 8000Nm³/h; a change to the filing of a wind-power hydrogen production project

    Tansuo Hydrogen Network / compiled by Hydrogen Energy Network

    Original value: Build hydrogen production equipment with a total hydrogen output capacity of 8000Nm³/h (8000Nm³/h)

    Original value: It is planned to build annual output of 3,530 tonnes of green hydrogen (Planned annual green hydrogen)

    Original value: Issue a notice informing of the changed project filing

  • [Project list] Duolun County 2024 key project list

    Duolun County Development and Reform Commission · As of 2024-04-18

    Original value: Construction scale: 0.35 ten-thousand tonnes of hydrogen production per year, synthesizing 20,000 tonnes of ammonia. (ten-thousand tonnes/year) (Product: Hydrogen)

Projects in China

Major projects: operating and FID first, then by recorded capacity.

All projects in this country