StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionFinlandInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity1,000 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Status & timeline

EventOn 16 April 2024, Plug Power reported that its Kristinestad project was at an early development stage, with Karhusaari port connection pre-studies underway and an environmental impact assessment being launched; GravitHy was identified as the planned DRI-factory partner.launching the Environmental Impact Assessment
Date online (tracker field)2030 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameKristinestad, Finland

Additional project information

Administrative AreaKristinestadInternational Energy Agency · as of 2026
Capacity (kt H2/y)150 kt H2/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)192,308 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)1 GWInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NamePlug Power Kristinestad plant
View exact valuePlug Power Kristinestad plant
IEA Hydrogen Projects dataset——
Site NameKristinestad, Finland
View exact valueKristinestad, Finland
Plug Doing Real Things: Kristinestad, Finland—
CountryFinland
View exact valueFinland
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyPEM
View exact valuePEM
IEA Hydrogen Projects dataset——
Capacity1,000 MW
View exact value1000 MW
IEA Hydrogen Projects dataset——
EventOn 16 April 2024, Plug Power reported that its Kristinestad project was at an early development stage, with Karhusaari port connection pre-studies underway and an environmental impact assessment being launched; GravitHy was identified as the planned DRI-factory partner.
View exact valueOn 16 April 2024, Plug Power reported that its Kristinestad project was at an early development stage, with Karhusaari port connection pre-studies underway and an environmental impact assessment being launched; GravitHy was identified as the planned DRI-factory partner.
Plug Doing Real Things: Kristinestad, Finland—
Eventlaunching the Environmental Impact Assessment
View exact valuelaunching the Environmental Impact Assessment
Plug Doing Real Things: Kristinestad, FinlandCurrent
EventDate online : 2030
View exact value{"date":"2030","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusFeasibility
View exact valueFeasibility study
IEA Hydrogen Projects dataset——
Administrative AreaKristinestad
View exact valueKristinestad
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)150 kt H2/y
View exact value149.93076923076922 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)192,308 Nm³ H₂/h
View exact value192307.6923076923 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (Announced Size)1 GW
View exact value1GW
IEA Hydrogen Projects dataset——

Record history

3 current sourced values · 6 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.