Cabo Negro Green Hydrogen Plant
PEM
Under construction · counted as FID / Construction
- Capacity
- —
- Target operation
- 2026
- Technology
- PEM electrolyser
- Country
- —
- Development stage
- Under construction · counted as FID / Construction
- Connected companies
- 1
Sources: original names
Original name: Planta Hidrógeno Verde Cabo Negro
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Function
- Production
- Permit date
- 27.04.2026
- Production capacity
- The plant will have a production capacity of 19 kilograms of hydrogen per hour
- Reported size
- 1 MW PEM electrolyzer
- Product
- Hydrogen
- Announced schedule
- 2025
Sources (9)
- Enap's green hydrogen plant is 72% complete
ENAP
Original value: 72% de avance en la construcción
Original value: Cabo Negro (Site: Cabo Negro)
English rendering: 72% progress in construction
- Q3 2025 Results Presentation
ENAP
Original value: Production (Function: Production)
Original value: has already begun to arrive
- ENAP
ENAP
Original value: Production (Function: Production)
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: electrolizador PEM de 1 MW
Original value: 72% construction progress
Original value: Hydrogen (Product: Hydrogen)
English rendering: 1 MW PEM electrolyzer
- Superintendency of Electricity and Fuels
Superintendency of Electricity and Fuels
Original value: 27.04.2026 (Permit: SEC special-project authorization 38787 · Target actual: actual)
- A zero-emission energy source for Chile
Superintendency of Electricity and Fuels
Original value: 27.04.2026 (Permit: SEC special-project authorization 38787 · Target actual: actual)
- Enap's green hydrogen plant is 72% complete
ENAP · As of 2025-10-15
Original value: La planta tendrá una capacidad de producción de 19 kilos de hidrógeno por hora (Product: Hydrogen)
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: electrolizador PEM de 1 MW
Original value: 72% construction progress
Original value: Hydrogen (Product: Hydrogen)
English rendering: The plant will have a production capacity of 19 kilograms of hydrogen per hour
English rendering: 1 MW PEM electrolyzer
- Enap's green hydrogen plant is 72% complete
Enap · As of 2025-10-15
Original value: 2026 (Operation event: startup)
Original value: Under construction
- Ministry of Energy / Library of the National Congress of Chile
Ministry of Energy / Library of the National Congress of Chile
Original value: 2025
- Decree 76, Green Hydrogen Action Plan
Ministry of Energy / Library of the National Congress of Chile · As of 2026-06-09
Original value: 2025
Companies and roles
| Company | Role in project |
|---|---|
| NEUMAN & ESSER | EPC |
Sources (1)
- ENAP green hydrogen plant reaches 72 percent completion
ENAP · As of 2025-10-15
Original value: EPC
Related projects