Pioneer 2
PEM
Operational
- Capacity
- —
- Target operation
- —
- Technology
- PEM electrolyser
- Country
- —
- Development stage
- Operational
Project details
- Announced schedule
- 2026
- Operation date
- 2026
- Production capacity
- producing up to one tonne of green hydrogen per day (tonne H2/day)
- Reported size
- 2.5 MWe Nel proton exchange membrane (PEM) electrolyser
Sources (5)
- Pioneer 2 construction update
Protium
Original value: achievement of first gas at Pioneer 2
- Protium
Protium
Original value: 2026
Original value: commercial operation
Original value: 2026 (Operation event: commercial)
Original value: 2.5 MWe Nel proton exchange membrane (PEM) electrolyser
Original value: PEM electrolyser (Technology: PEM electrolyser)
- Pioneer 2: Green Hydrogen Production in South Wales
Protium · As of 2026-07-20
Original value: 2026
Original value: commercial operation
Original value: 2026 (Operation event: commercial)
Original value: producing up to one tonne of green hydrogen per day (tonne H2/day) (Product: Hydrogen)
Original value: 2.5 MWe Nel proton exchange membrane (PEM) electrolyser
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Operational
- Protium powers construction of Pioneer 2 with 100% green hydrogen
Protium
Original value: Renewable (Electricity source: Renewable)
Original value: power construction activities at its Pioneer 2 facility
- Contact
Protium
Original value: Baglan Bay Chemical Works, Baglan, Port Talbot (Site: Baglan Bay Chemical Works, Baglan, Port Talbot)