Pioneer 2

PEM

Operational

Capacity
—
Target operation
—
Technology
PEM electrolyser
Country
—
Development stage
Operational

Project details

Announced schedule
2026
Operation date
2026
Production capacity
producing up to one tonne of green hydrogen per day (tonne H2/day)
Reported size
2.5 MWe Nel proton exchange membrane (PEM) electrolyser
Sources (5)
  • Pioneer 2 construction update

    Protium

    Original value: achievement of first gas at Pioneer 2

  • Protium

    Protium

    Original value: 2026

    Original value: commercial operation

    Original value: 2026 (Operation event: commercial)

    Original value: 2.5 MWe Nel proton exchange membrane (PEM) electrolyser

    Original value: PEM electrolyser (Technology: PEM electrolyser)

  • Pioneer 2: Green Hydrogen Production in South Wales

    Protium · As of 2026-07-20

    Original value: 2026

    Original value: commercial operation

    Original value: 2026 (Operation event: commercial)

    Original value: producing up to one tonne of green hydrogen per day (tonne H2/day) (Product: Hydrogen)

    Original value: 2.5 MWe Nel proton exchange membrane (PEM) electrolyser

    Original value: PEM electrolyser (Technology: PEM electrolyser)

    Original value: Operational

  • Protium powers construction of Pioneer 2 with 100% green hydrogen

    Protium

    Original value: Renewable (Electricity source: Renewable)

    Original value: power construction activities at its Pioneer 2 facility

  • Contact

    Protium

    Original value: Baglan Bay Chemical Works, Baglan, Port Talbot (Site: Baglan Bay Chemical Works, Baglan, Port Talbot)